Well drilling; display

    If you want to drill a well, you must indicate this.

    Description

    The competent authority must be notified of any work that penetrates so deeply into the ground that it may have a direct or indirect effect on the movement, level or quality of the groundwater. Among other things, the construction of a well must be notified.

    If a well drilling company is commissioned to drill the well, it is obliged to notify the authority.

    If a well is constructed without prior notification, this constitutes an administrative offense for which a fine of up to EUR 5,000 is imposed. Furthermore, in such cases it may also be necessary under certain circumstances to dismantle the well professionally.

    Online service

    Wasserrecht - Grundwasserentnahme - Anzeige einer Brunnenbohrung; Supplement: Landratsamt Schweinfurt

    ID: L100042_57787.-88951

    Description

    According to Section 49 of the German Federal Water Act (WHG), the district administrative authority must be notified of boreholes and other earth excavations if they may reach into the groundwater.

    Use this service online

    Trust level

    The level of trust for this online service is not defined (Trust Level undefined).

    further information on the level of trust for online services

    Language

    Deutsch

    Sprache: de

    Englisch

    Sprache: en
    Sprachbezeichnung nativ: English

    Contact person

    Landratsamt Schweinfurt - Wasserrecht (42.3)

    Address

    address

    Schrammstr. 1
    97421 Schweinfurt

    Save contact

    postal address

    Post office box 1450
    97404 Schweinfurt

    Opening hours

    Mo 08:00 Uhr - 12:00 Uhr

    Di 08:00 Uhr - 12:00 Uhr und 14:00 Uhr - 16:00 Uhr

    Mi 08:00 Uhr - 12:00 Uhr

    Do 08:00 Uhr - 12:00 Uhr und 14:00 Uhr - 17:00 Uhr

    Fr 08:00 Uhr - 12:00 Uhr


    und nach Vereinbarung

    Contact

    E-Mail: wasserrecht@lrasw.de

    Kontaktformular sicher: https://formularserver-bp.bayern.de/sichererKontakt?caller=6254212830499Sicheres Kontaktformular

    Sonstiges: https://www.bayernportal.de/dokumente/behoerde/6254212830499Weiterführende Informationen im BayernPortal

    Telefon Festnetz: +49 9721 55-575

    Fax: +49 9721 55-337

    Language version

    Deutsch

    Sprache: de

    Englisch

    Sprache: en
    Sprachbezeichnung nativ: English

    Required documents

    • The following documents must be enclosed with the notification:

      • General plan with marking of the project location
      • Detailed location plan with entry of the project site
      • Expected layer profile of the subsoil
      • True-to-scale development plan according to DIN 4022 and Din 4023
      • Notice from the water supplier about the exemption from the connection and use obligation
      • If applicable, declaration of consent of the property owner
      • If applicable, certification according to DVGW W 120 of the drilling company in case of first-time notification.
      • If applicable, declaration of the drilling company commissioned

    Prerequisites

    You intend to drill a well from which you want to draw water.
    Administrative court action

    Procedure

    You must submit the notification to the responsible lower water authority (district office or independent city).

    As part of the notification, the competent authority will check, in particular with the involvement of the water management authority, whether the installation of the well at the planned location is possible and, if so, under what restrictions. Furthermore, as part of this examination, a decision is made as to whether a permit procedure under water law must be carried out in addition to the notification. The result of this examination is communicated in writing by the competent authority. If the competent authority does not prohibit the construction of the well within one month of receipt of the complete notification, the well can be constructed as notified if the planned use does not require a permit.

    The drilling company must submit the drilling documentation after completion of the drilling work without further request. These are

    • Well development plan with layer index and drilling profile,
    • Measurement of the top edge of the well at NN (standard zero)
    • Site plan with the exact well location and
    • Pumping test diagram (water level at rest/lowering of the water level at full pump load) in duplicate

    Deadlines

    The notification must be made at least one month before the planned start of the work.

    Costs

    Fees for the examination of a complaint: EUR 25.00 to EUR 1,000.00

    Notes (specifics)

    The Bavarian State Office for the Environment (LfU) must be notified of all boreholes two weeks before work begins (see "Related topics").

    Area of validity

    Bavaria

    Official approval

    Officially approved by Bayerisches Staatsministerium für Umwelt und Verbraucherschutz (Bavarian State Ministry of the Environment and Consumer Protection) on 06.03.2026

    Information for Schweinfurt: Supplement: Landratsamt Schweinfurt