Construction products; application for notification as a testing laboratory or certification body
In order to be able to participate in the assessment and verification of the constancy of performance of construction products within the framework of CE marking, independent third-party bodies (testing laboratories and certification bodies) require notification.
Description
The Construction Products Regulation (CPR) requires notification for bodies that are authorized to perform the tasks of an independent third party for the assessment and verification of constancy of performance.
Two versions of the Construction Products Regulation are currently valid in parallel:
- Regulation (EU) No. 305/2011 - CPR 2011 for short, and
- Regulation (EU) 2024/3110 - BauPVO 2024 for short
In principle, the version of the CPR under which the harmonized standard, the legal act or the EAD was published in the Official Journal of the EU applies.
Notified bodies can therefore be notified for activities under both the CPR 2011 and the CPR 2024.
The details of the assessment and verification systems are set out in
- Annex V of the CPR 2011 - AVCP systems (Systems of Assessment and Verification of Constancy of Performance) - and
- Annex IX of the CPR 2024 - AVS(Assessmentand Verification Systems)
are regulated.
Contact person
Deutsches Institut für Bautechnik
Address
address
Kolonnenstraße 30 L
10829 Berlin
postal address
Kolonnenstraße 30 L
10829 Berlin
Contact
E-Mail: info@dibt.de
Sonstiges: https://www.bayernportal.de/dokumente/behoerde/9799615219110Weiterführende Informationen im BayernPortal
Telefon Festnetz: +49 30 78730-0
Fax: +49 30 78730-320
Internet
Required documents
- Depending on the activity for which notification is sought, the following evidence is required:
- Accreditation according to DIN EN ISO/IEC 17025
- Accreditation according to DIN EN ISO/IEC 17065
- Accreditation according to DIN EN ISO/IEC 17029
- Annex to the accreditation certificate on the fulfillment of the requirements of the Construction Products Regulation
Prerequisites
The most important requirements for notified bodies include impartiality, the absence of conflicts of interest, technical competence, sufficient experience and suitable premises and technical equipment.
The requirements are regulated in detail in Article 46 of Regulation (EU) 2024/3110.
The prerequisite for notification is accreditation by the Deutsche Akkreditierungsstelle GmbH (DAkkS). As part of this procedure, DAkkS checks in particular whether the body fulfills the specific requirements of the Construction Products Regulation and confirms this in the associated documents for the accreditation procedure. The DAkkS and the DIBt have drawn up special rules for this. Therefore, when applying for accreditation, please state explicitly that you are seeking notification in accordance with the Construction Products Regulation.
Basis for legal action
- Gesetz zur Durchführung der Verordnungen (EU) Nr. 305/2011 und (EU) 2024/3110 zur Festlegung harmonisierter Vorschriften für die Vermarktung von Bauprodukten (Bauproduktengesetz - BauPG)
- Satzung des Deutschen Instituts für Bautechnik
- Bauproduktenverordnung - Verordnung (EU) Nr. 305/2011 des Europäischen Parlaments und des Rates vom 9. März 2011 zur Festlegung harmonisierter Bedingungen für die Vermarktung von Bauprodukten und zur Aufhebung der Richtlinie 89/106/EWG des Rates; konsolidierte Fassung vom 17. November 2024; Amtsblatt der Europäischen Union
- Bauproduktenverordnung - Verordnung (EU) 2024/3110 des Europäischen Parlaments und des Rates vom 27. November 2024 zur Festlegung harmonisierter Vorschriften für die Vermarktung von Bauprodukten und zur Aufhebung der Verordnung (EU) Nr. 305/2011; ABl. L, 2024/3110, 18.12.2024; Amtsblatt der Europäischen Union
Procedure
Submit the accreditation notification(s), the accreditation certificate(s) including annex(es) together with the completed application form(s) to DIBt.
If the requirements and conditions for an activity as an independent third party are fulfilled, DIBt issues a corresponding notification and notifies the body to the European Commission and the other EU Member States.
Deadlines
Costs
- Notification related to construction products: 500 to 10,000 EUR
- Horizontal notification: EUR 1,000 to 10,000
- Extension and amendment of notification: EUR 250 to EUR 5,000
- Revocation and withdrawal of notifications: EUR 500 to 10,000
- Official acts in the context of the inspection of notified testing and certification bodies, insofar as these do not lead to the revocation or withdrawal of notifications: per working hour or part thereof, fee in accordance with tariff item 5 letter e) of the German Institute for Building Technology's schedule of fees
Further Information
Area of validity
Bavaria
Official approval
Officially approved by Bayerisches Staatsministerium für Wohnen, Bau und Verkehr (Bavarian State Ministry of Housing, Building and Transport) on 20.03.2026