Excavation; submission of documents for excavation without a permit

    If your excavation project is within the scope of a development plan that contains regulations on the permissibility, location and size of the excavation, it may not require a permit.

    Description

    If your excavation project is within the scope of a development plan that contains regulations on the permissibility, location and size of the excavation, it may be exempt from approval under certain conditions (see "Conditions").

    Nevertheless, the documents required for an excavation application must be submitted. However, the municipality can apply for a provisional prohibition within one month of submission.

    Even if the project does not require a permit, it must comply with all applicable regulations.

    Online services

    Bauantrag online

    ID: L100042_132728.-132322

    Description

    You can submit a building application, excavation application, change application and documents for the permit exemption procedure or for an excavation without a procedure online.

    Use this service online

    • Bauantrag online

      You can submit a building application, excavation application, change application and documents for the permit exemption procedure or for an excavation without a procedure online.

    Trust level

    The level of trust for this online service is not defined (Trust Level undefined).

    further information on the level of trust for online services

    Language

    Deutsch

    Sprache: de

    Englisch

    Sprache: en

    Sprachbezeichnung nativ:

    English

    Freiflächen Abfrage - Onlineformular

    ID: L100042_203778.-132322

    Description

    Wie überall in Bayern, sind auch in Landshut Gewerbeflächen ein rares Gut. Dennoch, sprechen Sie uns an, wenn Sie einen neuen Standort oder Erweiterungsflächen suchen. Wir arbeiten ständig an der Entwicklung entsprechender Flächen und können häufig auch über unser Netzwerk Lösungen anbieten. In den vergangenen Jahren konnte eine Fläche von etwa 170.000 Quadratmeter Gewerbeflächen auf dem Stadtgebiet entwickelt werden.

    Use this service online

    • Freiflächen Abfrage - Onlineformular
      Wie überall in Bayern, sind auch in Landshut Gewerbeflächen ein rares Gut. Dennoch, sprechen Sie uns an, wenn Sie einen neuen Standort oder Erweiterungsflächen suchen. Wir arbeiten ständig an der Entwicklung entsprechender Flächen und können häufig auch über unser Netzwerk Lösungen anbieten. In den vergangenen Jahren konnte eine Fläche von etwa 170.000 Quadratmeter Gewerbeflächen auf dem Stadtgebiet entwickelt werden.

    Trust level

    The level of trust for this online service is not defined (Trust Level undefined).

    further information on the level of trust for online services

    Language

    Deutsch

    Sprache: de

    Englisch

    Sprache: en

    Sprachbezeichnung nativ:

    English

    Contact person

    Stadt Landshut

    Address

    address

    Altstadt 315

    84028 Landshut

    Save contact

    postal address

    84026 Landshut

    Opening hours

    Mo 08:00 Uhr - 12:00 Uhr und 14:00 Uhr - 16:00 Uhr

    Di 08:00 Uhr - 12:00 Uhr und 14:00 Uhr - 16:00 Uhr

    Mi 08:00 Uhr - 12:00 Uhr und 14:00 Uhr - 16:00 Uhr

    Do 08:00 Uhr - 12:00 Uhr und 14:00 Uhr - 16:00 Uhr

    Fr 08:00 Uhr - 12:00 Uhr


    und nach Vereinbarung

    Contact

    E-Mail: poststelle@landshut.de

    Sonstiges: https://formularserver-bp.bayern.de/sichererKontakt?caller=22442654386Sicheres Kontaktformular

    Sonstiges: https://www.bayernportal.de/dokumente/behoerde/22442654386Weiterführende Informationen im BayernPortal

    Telefon Festnetz: +49 871 88-0

    Fax: +49 871 24570

    Internet

    Language version

    Deutsch

    Sprache: de

    Englisch

    Sprache: en

    Sprachbezeichnung nativ:

    English

    Required documents

    • current cadastral map extract
    • Site plan

      (M 1 : 1,000 or 1 : 5,000)

    • Construction drawings
    • Building description (form see under "Forms")
    • any supporting documentation

      Depending on the excavation applied for, further documents may be required. This is particularly the case if an environmental impact assessment is to be carried out.

    Prerequisites

    Under the following conditions, the submission of the documents required for an excavation application is sufficient for an excavation procedure without the need for an excavation permit:

    • The project lies within the scope of a development plan that contains regulations on the permissibility, location and size of the excavation,
    • an environmental impact assessment was carried out for an excavation requiring an environmental impact assessment as part of the procedure for drawing up the development plan,
    • the excavation does not contradict the provisions of the development plan and local building regulations and
    • the development is secured.

    However, the municipality can apply to the lower excavation authority for a provisional prohibition in accordance with Section 15 (1) sentence 2 of the German Building Code (BauGB).

    If the municipality applies for provisional prohibition, you cannot appeal against this, as it is purely an internal administrative matter. You can appeal to the administrative court against the decision of the lower excavation authority regarding the provisional prohibition.

    Procedure

    Written submission
    • Submit the required documents to the municipality in whose area the excavation site is located.
    • The documents correspond to those of an excavation application together with an excavation plan and must be submitted in triplicate using the forms provided.
    • Notify the neighbors of the excavation site of the excavation project at the latest when submitting the documents to the municipality. It is better to involve the neighbors in advance by submitting the excavation plan for their approval.
    • The municipality can request that an approval procedure be carried out within one month of submitting the documents. This means that the documents will automatically be treated as a building application, provided you have noted this accordingly on the building application form. The lower building supervisory authority is responsible for examining and deciding on the building application.
    • The municipality can only oppose your project by applying for a temporary ban on the excavation work within one month of submitting the documents. The lower excavation authority must then decide on such an application.
    • However, if the municipality does not apply for a temporary ban on excavation within one month or declares that it will not apply for a temporary ban, your project is not subject to approval.
    Digital submission

    Digital submission of documents for excavation without a permit is not yet possible throughout Bavaria. When selecting a location, the link to the online procedure is displayed, if it is already offered.

    • The documents can be submitted digitally using the online assistant. The predefined forms are replaced by the queries in the online assistant.
    • The excavation plan is uploaded to the online assistant in electronic form (files in PDF format). Signatures are replaced by authentication using the "BayernID" user account or "My company account".
    • The documents are first sent to the lower excavation authority, which forwards them immediately to the responsible municipality. The one-month period, after which the project is exempt from approval, begins with the submission of the digital documents.

    Deadlines

    In principle, there are no deadlines.

    However, if you do not want to start work until more than four years after the excavation has been permitted, you must resubmit the required documents.

    Processing time

    If the municipality does not apply for a provisional prohibition within one month of submission of the required documents, you may commence execution.

    Costs

    none

    Notes (specifics)

    If your excavation project does not require a permit, you are responsible for ensuring that the requirements for exemption from approval are met and that public law regulations are complied with.

    Please note that you must notify the lower excavation authority of the start of excavation at least one week in advance.

    Further Information

    Area of validity

    Bavaria

    Official approval

    Officially approved by Bayerisches Staatsministerium für Wohnen, Bau und Verkehr (Bavarian State Ministry of Housing, Building and Transport) on 17.11.2025

    Information for Landshut: Supplement: Stadt Landshut

    Officially approved by Stadt Landshut on 31.10.2025

    Keywords

    Freistellung, Freistellungsverfahren

    Language version

    Deutsch

    Sprache: de

    Englisch

    Sprache: en

    Sprachbezeichnung nativ:

    English