Materials containing asbestos; application for approval as a specialist company
Work with asbestos in high-risk areas may only be carried out by specialist companies that have been approved by the competent authority to carry out this work.
Description
If you want to carry out activities with asbestos in the high-risk area, you need a license for these activities for your company.
The license is issued on application by the trade supervisory office responsible for you. The application must be accompanied by proof of sufficient personnel and safety equipment (see requirements).
Contact person
Regierung von Unterfranken - Bauarbeiterschutz und Sprengwesen
Address
address
Georg-Eydel-Str. 13
97082 Würzburg
postal address
Post office box 6349
97013 Würzburg
Opening hours
Mo 9:00 Uhr - 11:30 Uhr und 12:30 Uhr - 15:00 Uhr
Di 9:00 Uhr - 11:30 Uhr und 12:30 Uhr - 15:00 Uhr
Mi 9:00 Uhr - 11:30 Uhr und 12:30 Uhr - 15:00 Uhr
Do 9:00 Uhr - 11:30 Uhr und 12:30 Uhr - 15:00 Uhr
Fr 9:00 Uhr - 12:00 Uhr
Contact
Sonstiges: https://www.bayernportal.de/dokumente/behoerde/2350528412298Weiterführende Informationen im BayernPortal
Telefon Festnetz: +49 931 380-1802
Fax: +49 931 380-1803
Required documents
- Copies of the certificates on the successful participation of the experts employed in the company in officially recognised expert courses or proof of qualification in accordance with Annex 10 of TRGS 519.
(Expertise according to Annex 3 and Annex 4 of TRGS 519 as well as qualification according to Annex 10 of TRGS 519)
- if applicable, confirmation of the possibility of renting/loaning in terms of the equipment list
- Operating instructions
- Sample work plans
- Test results of ventilation systems
- References about refurbished buildings / facilities
- evidence of the practical experience of supervisors
- Business registration
- Extract from the entry at the registry court in which the managing persons are named
- Evidence of occupational health screening of the remediation specialists
- Certificate of good conduct for submission to an authority
Prerequisites
Approval can only be granted if the applicant can provide evidence of sufficient personnel and safety equipment
The staffing includes the following evidence:
- Appointment of a competent responsible person and a competent representative in accordance with No. 5.1 of TRGS 519 (for expertise requirements, see No. 2.7 of TRGS 519)
- Written assignment of the supervisor(s) in accordance with No. 5.2 of TRGS 519 (for requirements for expertise and qualification, see No. 2.7 of TRGS 519)
- Employment of a sufficient number of skilled workers who are able to carry out the work properly and safely as well as to operate and monitor the required safety equipment
The safety equipment includes the following equipment described below, which must be used on the construction site or kept ready for use at the depot:
1. demolition and renovation work on sprayed asbestos
- Partitioning
- Marking of the work area
- Ventilation system (RLT with negative pressure monitoring)
- Measuring device for negative pressure maintenance and recording/recorder
- Personnel decontamination system; four chambers
- Sanitary/washing facilities on site
- Material decontamination system; at least two chambers
- Packaging material for materials containing asbestos (labeled in accordance with Annex 2 of TRGS 519)
- If necessary, containers for collecting reusable protective clothing or work clothing containing asbestos with labeling in accordance with Annex 2 of TRGS 519
- Waste water collection container, waste water filter system if necessary
- Low-pressure spraying device
- Industrial vacuum cleaner/dust extractor in accordance with Annex 7.1 of TRGS 519
- HVG high-performance vacuum cleaner
- Equipment cleaning facilities at the depot (company headquarters)
- Radiotelephones
2. demolition and renovation work on weakly bound asbestos products - without sprayed asbestos
- Partitioning
- Marking of the work area
- Ventilation system (RLT with negative pressure monitoring)
- Measuring device for negative pressure maintenance and recording/recorder
- Personnel decontamination system; at least three chambers
- Material decontamination system; at least two chambers
- Sanitary/washing facilities on site
- Packaging material for materials containing asbestos (labeled in accordance with Annex 2 of TRGS 519)
- If necessary, containers for collecting reusable protective clothing or work clothing containing asbestos with labeling in accordance with Annex 2 of TRGS 519
- Waste water collection container, waste water filter system if necessary
- Low-pressure spraying device
- Industrial vacuum cleaner/dust extractor in accordance with Annex 7.1 of TRGS 519
- Equipment cleaning facilities at the depot (company headquarters)
- Radiotelephones
3. small-scale demolition and renovation work on weakly bound asbestos products indoors
- Partitioning/foil door
- Marking of the work area
- Ventilation system/ventilation unit; for small rooms: use of a suitable industrial vacuum cleaner/dust extractor according to Annex 7.1 of TRGS 519 (according to number 14.4 paragraph 3 of TRGS 519, an eightfold air exchange per hour must be ensured)
- Personnel decontamination system
- Sanitary/washing facilities on site
- Material decontamination facility
- Packaging material for asbestos-containing materials (labeled in accordance with Annex 2 of TRGS 519)
- Containers for the collection of reusable protective clothing or work clothing containing asbestos with labeling in accordance with Annex 2 of TRGS 519
- Low pressure sprayer
- Industrial vacuum cleaner/dust extractor in accordance with Annex 7.1 of TRGS 519
- Equipment cleaning facilities at the depot (company headquarters)
Compulsory occupational health care in accordance with the Ordinance on Occupational Health Care must have been carried out for all employees working with materials containing asbestos before work begins.
Note: It is at the discretion of the competent authority to ask the applicant to provide evidence of the mandatory occupational health screening carried out for all employees.
Basis for legal action
Legal remedy
Procedure
The application for approval as a specialist company in accordance with the Hazardous Substances Ordinance (GefStoffV), Annex I No. 2.4.2 Paragraph 4 for demolition and renovation work on weakly bound asbestos products must be submitted to the trade supervisory office responsible for the company headquarters.
Deadlines
Approval as a specialist company must have been granted by the trade supervisory office responsible for the company headquarters before the start of activities.
Processing time
Costs
Depending on the administrative costs, from EUR 100 to EUR 2,500 (framework fee in accordance with the Schedule of Costs under the Costs Act).
Notes (specifics)
Further Information
- Bundesanstalt für Arbeitsschutz und Arbeitsmedizin (BAUA) - AsbestStoffinformationen Asbest und weiterführende Links
- DGUV Information 201-012 (bisher: BGI 664) "Asbestsanierung"
Area of validity
Bavaria
Official approval
Officially approved by Bayerisches Staatsministerium für Umwelt und Verbraucherschutz (Bavarian State Ministry of the Environment and Consumer Protection) on 10.04.2026
Keywords
Asbest, Fachbetriebszulassung