Building project; submission of documents for exemption from approval

    You generally need a building permit to erect, modify or change the use of a facility. Under certain conditions, your building project may be exempt from the obligation to obtain planning permission.

    Description

    In principle, exemption from approval can be granted for all structures except for special structures. However, this is only possible under certain conditions (see "Conditions"). However, even if a project is exempt from approval, it must still comply with all regulations to be observed.

    Even if all the requirements for exemption from approval are met, you are not entitled to such an exemption. It is at the discretion of the local authority to decide whether or not a building permit procedure should be carried out.

    Information for Bad Tölz-Wolfratshausen: Supplement: Landratsamt Bad Tölz-Wolfratshausen

    Please give priority to using the online service above via the "Online building application" button.

    Under the further links you will find the page reference to the "Building application procedure".

    The "FAQ on the digital building application procedure" with numerous questions + answers can be found in the Forms section.

    Online service

    Bauantrag online

    ID: L100042_50322.-88732

    Description

    You can submit a building application, excavation application, change application as well as documents in the permit exemption procedure or for a procedure-free excavation online.

    Use this service online

    • Bauantrag online

      You can submit a building application, excavation application, change application as well as documents in the permit exemption procedure or for a procedure-free excavation online.

    Trust level

    The level of trust for this online service is not defined (Trust Level undefined).

    further information on the level of trust for online services

    Language

    Deutsch

    Sprache: de

    Englisch

    Sprache: en

    Sprachbezeichnung nativ:

    English

    Contact person

    Landratsamt Bad Tölz-Wolfratshausen - Sachgebiet 22 - Kreisbauamt Verwaltung

    Address

    address

    Prof.-Max-Lange-Platz 1

    83646 Bad Tölz

    Save contact

    postal address

    Prof.-Max-Lange-Platz 1

    83646 Bad Tölz

    Opening hours

    Mo 7:30 Uhr - 12:00 Uhr und 13:30 Uhr - 18:00 Uhr

    Di 7:30 Uhr - 12:00 Uhr

    Mi 7:30 Uhr - 12:00 Uhr

    Do 7:30 Uhr - 12:00 Uhr

    Fr 7:30 Uhr - 12:00 Uhr


    Bitte vereinbaren Sie für die persönliche Vorsprache telefonisch oder per E-Mail einen Termin.

    Für Anliegen in der Kfz-Zulassung / Führerscheinstelle steht ihnen unsere Online Terminvereinbarung zur Verfügung.

    Contact

    E-Mail: kreisbauamt@lra-toelz.de

    Sonstiges: https://www.bayernportal.de/dokumente/behoerde/1944548681494Weiterführende Informationen im BayernPortal

    Telefon Festnetz: +49 8041 505-555

    Fax: +49 8041 505-394

    Language version

    Deutsch

    Sprache: de

    Englisch

    Sprache: en

    Sprachbezeichnung nativ:

    English

    Landratsamt Bad Tölz-Wolfratshausen - Sachgebiet 24 - Kreisbauamt Technik

    Address

    address

    Prof.-Max-Lange-Platz 1

    83646 Bad Tölz

    Save contact

    postal address

    Prof.-Max-Lange-Platz 1

    83646 Bad Tölz

    Opening hours

    Mo 7:30 Uhr - 12:00 Uhr und 13:30 Uhr - 18:00 Uhr

    Di 7:30 Uhr - 12:00 Uhr

    Mi 7:30 Uhr - 12:00 Uhr

    Do 7:30 Uhr - 12:00 Uhr

    Fr 7:30 Uhr - 12:00 Uhr


    Bitte vereinbaren Sie für die persönliche Vorsprache telefonisch oder per E-Mail einen Termin.

    Für Anliegen in der Kfz-Zulassung / Führerscheinstelle steht ihnen unsere Online Terminvereinbarung zur Verfügung.

    Contact

    E-Mail: kreisbauamt@lra-toelz.de

    Sonstiges: https://www.bayernportal.de/dokumente/behoerde/1978104235494Weiterführende Informationen im BayernPortal

    Telefon Festnetz: +49 8041 505-555

    Fax: +49 8041 505-394

    Language version

    Deutsch

    Sprache: de

    Englisch

    Sprache: en

    Sprachbezeichnung nativ:

    English

    Verwaltungsgemeinschaft Benediktbeuern - Bauamt

    Address

    address

    Prälatenstr. 7

    83671 Benediktbeuern

    Save contact

    postal address

    Prälatenstr. 7

    83671 Benediktbeuern

    Opening hours

    Mo 08:00 Uhr - 12:00 Uhr

    Di 08:00 Uhr - 12:00 Uhr

    Do 08:00 Uhr - 18:00 Uhr

    Fr 08:00 Uhr - 12:00 Uhr


    sowie nach Vereinbarung.

    Um Wartezeiten zu vermeiden, wird um Terminvereinbarung, Tel. 08857 6913-25, gebeten.

    Contact

    E-Mail: bauamt@benediktbeuern.de

    Sonstiges: https://www.bayernportal.de/dokumente/behoerde/829510782965Weiterführende Informationen im BayernPortal

    Telefon Festnetz: +49 8857 6913-0

    Fax: +49 8857 6913-13

    Internet

    Language version

    Deutsch

    Sprache: de

    Englisch

    Sprache: en

    Sprachbezeichnung nativ:

    English

    Required documents

    • current cadastral map extract
    • Site plan

      Not required, provided only the alteration of structures is requested where exterior walls and roofs and use are not changed.

    • Construction drawings
    • Building description (form see under "Forms")
    • Fire protection certificate, if applicable

      Required only to the extent that it is subject to building inspection and is not already included in the other building submittals.

    • If necessary, information on the secured development with regard to the supply of water and energy as well as the disposal of waste water and the traffic development.

      Required only if the construction project cannot be connected to a public water or power supply or to a public sewage disposal system. Also required if the building project is not located in sufficient width on a public traffic area.

    • If necessary, consent to the transfer of distance areas (for form, see "Forms")
    • any supporting documentation

      Depending on the building project, further documents may be required, for example a tree inventory declaration. However, this is only required if requested by the municipality.

    Prerequisites

    The construction, modification or change of use of a building may be exempt from approval under the following conditions:

    • The project is not a special building,
    • it is within the scope of a qualified development plan or a project-related development plan,
    • it complies with the provisions of the development plan and any local building regulations,
    • the development is secured and
    • it is not a craft or commercial construction project for which the municipality has excluded the application of the permit exemption in the development plan.

    The municipality can declare that a building permit procedure is to be carried out despite these requirements being met.

    If the municipality declares that the simplified planning permission procedure is to be carried out, you have no right of appeal against this.

    Procedure

    Written submission

    First of all, please note that in the case of building applications for the construction and alteration of buildings, the building documents must be prepared by an authorized draftsman (architect, civil engineer; for smaller building projects, especially detached and semi-detached houses, also master craftsmen in the building and carpentry trades and state-certified technicians in the field of construction technology). This also applies to documents in the approval exemption procedure.

    • Submit the required documents to the municipality in whose area the building plot is located.
    • The documents correspond to those of a building application together with building documents and must be submitted in triplicate using the forms provided.
    • Notify the neighbors of the building plot of the building project at the latest when submitting the documents to the municipality. It is better to involve the neighbors in advance by submitting the site plan and the construction drawings for their approval.
    • The municipality can request that an approval procedure be carried out within one month of the documents being submitted. This means that the documents are automatically processed as a building application, provided you have noted this accordingly on the building application form. The lower building supervisory authority is responsible for examining and deciding on the building application.
    • However, if the municipality does not request the simplified approval procedure within one month or informs you in writing that no approval procedure is to be carried out, your project is exempt from approval.
    Digital submission

    Digital submission of documents in the approval exemption procedure is not yet possible throughout Bavaria. When selecting a location, the link to the online procedure will be displayed if it is already offered.

    • The documents can be submitted digitally using the online assistant.
    • The predefined building application and building description forms are replaced by the queries in the online assistant. The building documents are uploaded to the online assistant in electronic form (files in PDF format).
    • The signatures of the client and the authorized draftsman are replaced by authentication using the "BayernID" user account or "My company account". In particular, the (large-format) construction drawings do not need to be signed. They can therefore be generated as a file directly in the CAD system of the design author. If the building documents have to be created by an authorized designer, the designer must authenticate himself and submit the documents for the client.
    • The documents are first sent to the lower building supervisory authority, which forwards them immediately to the responsible municipality. The one-month period after which the project is exempt from approval begins with the submission of the digital documents.

    Deadlines

    In principle, there are no time limits.

    However, if you only want to start construction more than four years after the construction work has become permissible due to an approval exemption procedure, you must go through another approval exemption procedure.

    Processing time

    If the municipality does not inform you within one month of submission of the required documents that the simplified approval procedure is to be carried out, you may commence execution. This does not apply if the municipality applies for a provisional prohibition within one month of submission of the required documents.

    Costs

    There are no fees for the permit exemption. If the municipality informs you before the end of the one-month period that no approval procedure is to be carried out, it can charge a fee for this if it has regulated this in a municipal cost statute.

    Notes (specifics)

    If your building project is exempt from approval, you are responsible for ensuring that the requirements for exemption from approval are met and that public law regulations are complied with.

    Please note that you must notify the lower building supervisory authority of the start of construction at least one week in advance, even for building projects that do not require approval.

    Further Information

    Information for Bad Tölz-Wolfratshausen: Supplement: Landratsamt Bad Tölz-Wolfratshausen

    Area of validity

    Bavaria

    Official approval

    Officially approved by Bayerisches Staatsministerium für Wohnen, Bau und Verkehr (Bavarian State Ministry of Housing, Building and Transport) on 17.11.2025

    Information for Bad Tölz-Wolfratshausen: Supplement: Landratsamt Bad Tölz-Wolfratshausen

    Officially approved by Landratsamt Bad Tölz-Wolfratshausen on 25.11.2025

    Keywords

    Freistellung, Freistellungsverfahren, Genehmigungsfreistellungsverfahren

    Language version

    Deutsch

    Sprache: de

    Englisch

    Sprache: en

    Sprachbezeichnung nativ:

    English