Construction; notification of removal
You may only remove certain structures if you give prior notification of the intended removal. The removal of a structure must be notified if it is not exempt from the procedure.
Description
The notification of removal is not an application. You only need to inform the responsible authorities of the impending removal.
Only the complete removal of an installation must be notified. The partial removal of an installation is a change to an installation and may require planning permission.
The notification of removal is intended to give the lower building supervisory authority and the local authority sufficient time to check whether any measures need to be ordered before removal. If necessary, a qualified structural engineer must supervise the removal.
Consequences of non-notification
If you deliberately or negligently fail to report the removal of the installation one month prior to removal, you are committing an administrative offense. You can be fined up to EUR 500,000 for this.
Information for Bad Tölz-Wolfratshausen: Supplement: Landratsamt Bad Tölz-Wolfratshausen
Please give priority to using the online service arranged above via the "Display disposal online" button.
In the Forms section, you will find the "Survey form for building disposals and explanations (building activity statistics)".
You will also find a link to the "Building application procedure" under "Further links".
Online service
Beseitigung online anzeigen
Description
You can report the removal of a structure online.
Use this service online
- Beseitigung online anzeigen
You can report the removal of a structure online.
Trust level
The level of trust for this online service is not defined (Trust Level undefined).
further information on the level of trust for online services
Contact person
Landratsamt Bad Tölz-Wolfratshausen - Sachgebiet 22 - Kreisbauamt Verwaltung
Address
address
postal address
Prof.-Max-Lange-Platz 1
83646 Bad Tölz
Opening hours
Mo 7:30 Uhr - 12:00 Uhr und 13:30 Uhr - 18:00 Uhr
Di 7:30 Uhr - 12:00 Uhr
Mi 7:30 Uhr - 12:00 Uhr
Do 7:30 Uhr - 12:00 Uhr
Fr 7:30 Uhr - 12:00 Uhr
Bitte vereinbaren Sie für die persönliche Vorsprache telefonisch oder per E-Mail einen Termin.
Für Anliegen in der Kfz-Zulassung / Führerscheinstelle steht ihnen unsere
Online Terminvereinbarung zur Verfügung.Contact
E-Mail: kreisbauamt@lra-toelz.de
Sonstiges: https://www.bayernportal.de/dokumente/behoerde/1944548681494Weiterführende Informationen im BayernPortal
Telefon Festnetz: +49 8041 505-555
Fax: +49 8041 505-394
Landratsamt Bad Tölz-Wolfratshausen - Sachgebiet 24 - Kreisbauamt Technik
Address
address
postal address
Prof.-Max-Lange-Platz 1
83646 Bad Tölz
Opening hours
Mo 7:30 Uhr - 12:00 Uhr und 13:30 Uhr - 18:00 Uhr
Di 7:30 Uhr - 12:00 Uhr
Mi 7:30 Uhr - 12:00 Uhr
Do 7:30 Uhr - 12:00 Uhr
Fr 7:30 Uhr - 12:00 Uhr
Bitte vereinbaren Sie für die persönliche Vorsprache telefonisch oder per E-Mail einen Termin.
Für Anliegen in der Kfz-Zulassung / Führerscheinstelle steht ihnen unsere
Online Terminvereinbarung zur Verfügung.Contact
E-Mail: kreisbauamt@lra-toelz.de
Sonstiges: https://www.bayernportal.de/dokumente/behoerde/1978104235494Weiterführende Informationen im BayernPortal
Telefon Festnetz: +49 8041 505-555
Fax: +49 8041 505-394
Verwaltungsgemeinschaft Benediktbeuern - Bauamt
Address
address
postal address
Prälatenstr. 7
83671 Benediktbeuern
Opening hours
Mo 08:00 Uhr - 12:00 Uhr
Di 08:00 Uhr - 12:00 Uhr
Do 08:00 Uhr - 18:00 Uhr
Fr 08:00 Uhr - 12:00 Uhr
sowie nach Vereinbarung.
Um Wartezeiten zu vermeiden, wird um Terminvereinbarung, Tel. 08857 6913-25, gebeten.
Contact
E-Mail: bauamt@benediktbeuern.de
Sonstiges: https://www.bayernportal.de/dokumente/behoerde/829510782965Weiterführende Informationen im BayernPortal
Telefon Festnetz: +49 8857 6913-0
Fax: +49 8857 6913-13
Internet
Required documents
- Proof of stability
If you want to remove a building that is not freestanding, a qualified structural engineer must assess and demonstrate to the required extent that the building or buildings to which the building to be removed is attached will be stable during and after the removal. This does not apply if the building to be removed is attached to a building not subject to the procedure.
Prerequisites
You only have to report the removal of an installation if there is an obligation to do so.
There is no such obligation for installations whose erection is exempt from procedure. There is also no obligation for free-standing buildings in building classes 1 and 3 and for other installations that are not buildings with a maximum height of 10 m.
Basis for legal action
- Art. 57 Bayerische Bauordnung (BayBO)Verfahrensfreie Bauvorhaben, Beseitigung von Anlagen
- Verordnung über die digitale Einreichung bauaufsichtlicher Anträge und Anzeigen (Digitale Bauantragsverordnung - DBauV)
Legal remedy
Procedure
Written submission
- Submit the completed "Notification of removal" form in writing to the responsible municipality and the responsible building supervisory authority (district offices, independent cities, large district towns and certain larger municipalities).
- Verbal notification is not sufficient.
- You will not receive confirmation of receipt.
- The local authority will then check whether it wishes to take steps under planning law to prevent the removal. The lower building supervisory authority will check whether it needs to take steps under building regulations.
Digital submission
Digital submission of the notification of removal is not yet possible throughout Bavaria. When a location is selected, the link to the online procedure is displayed if it is already offered.
- The disposal can be reported digitally using the online assistant. The prescribed "Notification of disposal" form is replaced by the queries in the online assistant. Signatures are replaced by authentication using the "BayernID" user account or "My company account".
- The attachments are uploaded to the online assistant in electronic form (files in PDF format). The notification is first sent to the lower building supervisory authority, which forwards it immediately to the responsible municipality.
Deadlines
Costs
Notes (specifics)
In addition to the removal notification, you must notify the building supervisory authority of the start of the removal work one week before the start of the removal work using the form or the online construction start notification assistant. Please note that in some cases a qualified structural engineer must supervise the removal.
You may only remove monuments if you have obtained a corresponding permit under monument protection law. You must apply for this (independently of the notification of removal) at the responsible lower monument protection authority.
Further Information
Information for Bad Tölz-Wolfratshausen: Supplement: Landratsamt Bad Tölz-Wolfratshausen
- Bauantragsverfahren
Informationen zum Antragsverfahren, Unterlagen etc.
Area of validity
Bavaria
Official approval
Officially approved by Bayerisches Staatsministerium für Wohnen, Bau und Verkehr (Bavarian State Ministry of Housing, Building and Transport) on 17.11.2025
Information for Bad Tölz-Wolfratshausen: Supplement: Landratsamt Bad Tölz-Wolfratshausen
Officially approved by Landratsamt Bad Tölz-Wolfratshausen on 25.11.2025
Keywords
Abbruch, Abbruchanzeige, Abbruch von Gebäuden, Abriss, Abrissanzeige, Gebäudeabbruch anzeigen