Heat pumps and geothermal probes; notification of boreholes for installation

    Drilling for the installation of geothermal probe systems and groundwater heat pumps must be reported to the responsible district administrative authority in order to protect the soil and groundwater against contamination.

    Description

    In order to inform building owners, planners, specialist tradesmen and drilling companies about geothermal probes and to show the way to the proper construction of a system, the Ministries for the Environment and Consumer Protection and for Economic Affairs and Media, Energy and Technology, together with the Bundesverband WärmePumpe (BWP) e. V., have published a guide for the construction of geothermal probes for heat pump systems. In addition to basic statements on water law assessment, it provides information and recommendations on what needs to be observed when constructing and operating a geothermal probe system and provides information on the necessary application documents.

    The guide has been updated due to technical developments and legal changes and has been reprinted in a 4th edition. It can be downloaded from the Internet (see "Further links").

    Boreholes for the installation of geothermal probe systems must be reported to the responsible district administrative authority to protect the soil and groundwater against contamination.
    If the boreholes for the geothermal probes reach into the groundwater, a permit under water law is generally required.

    Online services

    There is currently no online service available for this location.

    Contact person

    Landratsamt Schweinfurt - Wasserrecht (42.3)

    Address

    address

    Schrammstr. 1
    97421 Schweinfurt

    Save contact

    postal address

    Post office box 1450
    97404 Schweinfurt

    Opening hours

    Mo 08:00 Uhr - 12:00 Uhr

    Di 08:00 Uhr - 12:00 Uhr und 14:00 Uhr - 16:00 Uhr

    Mi 08:00 Uhr - 12:00 Uhr

    Do 08:00 Uhr - 12:00 Uhr und 14:00 Uhr - 17:00 Uhr

    Fr 08:00 Uhr - 12:00 Uhr


    und nach Vereinbarung

    Contact

    E-Mail: wasserrecht@lrasw.de

    Kontaktformular sicher: https://formularserver-bp.bayern.de/sichererKontakt?caller=6254212830499Sicheres Kontaktformular

    Sonstiges: https://www.bayernportal.de/dokumente/behoerde/6254212830499Weiterführende Informationen im BayernPortal

    Telefon Festnetz: +49 9721 55-575

    Fax: +49 9721 55-337

    Language version

    Deutsch

    Sprache: de

    Englisch

    Sprache: en
    Sprachbezeichnung nativ: English

    Deadlines

    Work that penetrates so deeply into the ground that it may have a direct or indirect effect on the movement, level or quality of the groundwater must be notified to the competent authority one month before the work begins.

    If one month has passed since the notification without a cessation or removal order having been issued in accordance with Section 49 (3) WHG, the work may be commenced and carried out until the groundwater is affected.

    Notes (specifics)

    The Bavarian State Office for the Environment (LfU) must be notified of all geological investigations (including drilling) two weeks before work begins (see "Related topics").

    Further Information

    Area of validity

    Bavaria

    Official approval

    Officially approved by Bayerisches Staatsministerium für Umwelt und Verbraucherschutz (Bavarian State Ministry of the Environment and Consumer Protection) on 07.01.2026

    Information for Schweinfurt: Supplement: Landratsamt Schweinfurt

    Officially approved by Landratsamt Schweinfurt on 26.06.2025

    Language version

    Deutsch

    Sprache: de

    Englisch

    Sprache: en
    Sprachbezeichnung nativ: English