Small wastewater treatment plant; transmission of confirmation of proper installation
A private expert in water management (PSW) confirms the proper construction of a small wastewater treatment plant to the responsible authority on behalf of a building owner.
Description
Before a small wastewater treatment plant (WWTP) goes into operation, a building inspection must be carried out after completion in accordance with water legislation. For this purpose, the client commissions a private expert in water management (PSW). As part of an on-site inspection, the PSW confirms to the responsible authority that the small wastewater treatment plant has been constructed in accordance with the water law permit. If there are any deviations between the installed and the approved small wastewater treatment plant, these are determined by the PSW on site and described in the construction acceptance report.
Online services
There is currently no online service available for this location.
Contact person
Landratsamt Fürth
Address
address
postal address
Im Pinderpark 2
90513 Zirndorf
Opening hours
Mo 07:30 Uhr - 16:00 Uhr
Di 07:30 Uhr - 16:00 Uhr
Mi 07:30 Uhr - 16:00 Uhr
Do 07:30 Uhr - 17:00 Uhr
Fr 07:30 Uhr - 12:30 Uhr
und nach Vereinbarung
Contact
E-Mail: poststelle@lra-fue.bayern.de
Sonstiges: https://formularserver-bp.bayern.de/sichererKontakt?caller=02887002407Sicheres Kontaktformular
Sonstiges: https://www.bayernportal.de/dokumente/behoerde/02887002407Weiterführende Informationen im BayernPortal
Telefon Festnetz: +49 911 9773-0
Fax: +49 911 9773-1113
Internet
Required documents
- Photos
Photos must be uploaded documenting the location, the installed system and any existing deviations.
Prerequisites
The commissioned private expert must be recognized by the Bavarian State Office for the Environment for the "Small sewage treatment plants and wastewater collection pits" area of recognition in accordance with the Ordinance on Private Experts in Water Management (see "Further links").
Basis for legal action
Legal remedy
Procedure
The construction acceptance report should be prepared digitally by a recognized private expert in water management (PSW) and transmitted to the competent authority using the online procedure.
- The online procedure may only be used by a recognized private expert in water management (PSW). The recognition number must be stated.
- The PSW must confirm that he has been commissioned by the client.
- Upon dispatch, a data record is sent electronically to the responsible authority for further processing in its own municipal software programs.
- A pdf file can also be generated and sent by the system.
- The authority then informally completes the building inspection in accordance with water law without informing the PSW or operator.
- The PSW saves the contents that are transmitted via the online procedure as a summary (protocol as a file in pdf format) in its project file for documentation purposes. It also sends this file to the operator for its records in the operating log.
Deadlines
The building acceptance report must be drawn up:
- after completion (including proof of tightness)
- before the system is put into operation
Processing time
There is neither a statutory processing deadline nor a formal requirement for completion of the construction acceptance by the authority. If the PSW identifies and describes deviations between the installed small wastewater treatment plant and the planned or approved small wastewater treatment plant, the authority will take action.
Costs
The private expert in water management charges the operator of the small wastewater treatment plant for his work. No further costs are incurred by the authority.
Further Information
- Private Sachverständige Wasserwirtschaft (PSW)Listen der anerkannten PSW
- Verordnung über private Sachverständige in der Wasserwirtschaft
- Arbeitshilfen für Private Sachverständige in der WasserwirtschaftInformationen für PSW
- Abwasserentsorgung von EinzelanwesenInformationen für die Allgemeinheit zum Thema Kleinkläranlagen
- Broschüre "Abwasserbehandlung mit Kleinkläranlagen - Hinweise zu Planung, Bau und Betrieb"
- Häufige Fragen und AntwortenInformationen zu Kleinkläranlagen und Abwassersammelgruben
Area of validity
Bavaria
Official approval
Officially approved by Bayerisches Staatsministerium für Umwelt und Verbraucherschutz (Bavarian State Ministry of the Environment and Consumer Protection) on 28.09.2025