Discharge of wastewater into public wastewater systems: Authorization

    If you want to discharge commercial-industrial wastewater into a public wastewater plant or sewerage system, you usually need a permit.

    Description

    If you want to discharge wastewater into a public wastewater plant, you will need a permit. Under certain conditions, the permit requirement does not apply.

    For certain industries and activities (such as the chemical industry, paper production, metal processing, cooling water use), pollutants are to be expected in wastewater that are not sufficiently cleaned in a municipal wastewater treatment plant. Requirements for this are laid down in the industry-specific annexes to the Wastewater Ordinance.

    In order to comply with these requirements, special measures and wastewater pretreatment plants are required to reduce the pollutant load in such a way that the wastewater can then be cleaned without damage in a public wastewater treatment plant.

    Online services

    There is currently no online service available for this location.

    Competent office

    not specified

    Contact point

    The responsibility lies with districts, independent cities and large independent cities.

    A connection to the municipal sewage system may be required due to municipal statutes. The responsible authority should also be contacted in these cases.

    Contact person

    Unfortunately, no contact persons were found for District Verden (Lower Saxony). Please check the service description above for information on how to find the responsible contact person.

    Forms

    not specified

    Prerequisites

    The permit may only be granted if:

    the requirements of the Wastewater Ordinance applicable to wastewater are complied with,

    the public wastewater treatment plant can adequately treat the wastewater, and

    the wastewater is pre-treated during the discharge operation, if necessary, in such a way that the preceding conditions are met.

    Contradiction

    Procedure

    You can apply for a permit to discharge wastewater into public wastewater plants at the competent authority.

    You fill out the application documents and submit them with all the necessary documents.

    The competent authority will examine your application.

    If all the necessary requirements are met, your application can be approved.

    You will receive a permit to discharge wastewater into public wastewater plants

    Processing time

    not specified

    Costs

    Fees may apply. Please contact the responsible office.

    Notes (specifics)

    Changes

    • at the property drainage system,
    • the wastewater conditions on which the drainage permit is based, or
    • at the connection to the wastewater system
       

    require a change permit. Information is provided by the competent authority.

    The discharge of collected rainwater directly into an above-ground body of water and the infiltration of rainwater require a permit under water law (direct discharger permit).

    Further Information

    Unterstützende Institutionen

    not specified

    Welche Dokumente resultieren aus dieser Leistung?

    not specified

    Area of validity

    Lower Saxony

    Official approval

    Officially approved by Lower Saxony Ministry for the Environment, Energy and Climate Protection

    Version

    Technisch erstellt on 17.08.2007
    Technisch geändert on 14.04.2026

    Keywords

    Surface water

    Language version

    Deutsch

    Sprache: de
    Technisch erstellt on 07.06.2017
    Technisch geändert on 14.05.2025

    Englisch

    Sprache: en
    Sprachbezeichnung nativ: English
    Technisch erstellt on 22.10.2025
    Technisch geändert on 23.10.2024