Construction measures not requiring approval Notification

    The construction of certain buildings and other structures in residential

    residential and commercial areas is possible in individual cases without planning permission

    and can be approved within the

    Description

    The construction of certain buildings and other structures in residential and commercial areas is possible in individual cases without a building permit and can be reported within the framework of a notification procedure.

    Which buildings and other structures are permit-free construction measures and require written notification under which conditions is regulated in § 62 of the Lower Saxony Building Code (NBauO).

    Since no building permit is granted, the building owner, together with the draftsman, is responsible for complying with all the requirements that the construction project must meet.

    The building owner may request that a building permit procedure be carried out instead of a notification procedure. There are higher fees in the building permit process and the processing time is usually longer.

    Online service

    Construction measures not requiring approval Notification

    ID: L100040_531890173

    Use this service online

    Trust level

    You need an electronic ID card with a PIN to use the service (trust level: high).

    further information on the level of trust for online services

    Identification

    • electronic identification using national eID means - identity card
    • electronic identification using national eID means
    • electronic identification

    Version

    Technisch erstellt on 02.01.2024
    Technisch geändert on 23.10.2024

    Language

    Deutsch

    Sprache: de
    Technisch erstellt on 07.06.2017
    Technisch geändert on 14.05.2025

    Englisch

    Sprache: en
    Sprachbezeichnung nativ: English
    Technisch erstellt on 22.10.2025
    Technisch geändert on 23.10.2024

    Competent office

    The responsibility lies with the municipality, the joint municipality and the city. After checking the notification, the latter forwards it to the lower building supervisory authority for processing.

    Contact point

    The responsibility lies with the municipality, the joint municipality and the city. After checking the notification, the latter forwards it to the lower building supervisory authority for processing.

    Contact person

    Landkreis Wesermarsch - Dezernat 2 - Fachdienst 63 - Planen & Bauaufsicht

    Address

    address

    Poggenburger Straße 7
    26919 Brake (Unterweser)

    Save contact

    Elevator available
    Wheelchair access

    Opening hours

    Mo - Do  08:00 - 15:30 Uhr Freitag   08:00 - 12:00 Uhr und nach Vereinbarung

    Contact

    Contact person

    Internet

    Payment methods

    The following payment methods are possible:

    • SEPA transfer
    • Bill
    • Transfer
    • Cash payment

    Bank account

    Kreiskasse des Landkreises Wesermarsch

    Recipient: Kreiskasse des Landkreises Wesermarsch
    IBAN: DE17 2805 0100 0060 4005 79
    BIC: SLZODE22
    Bank institution: Landessparkasse zu Oldenburg (LzO)

    Forms

    Bauen: Anzeige zur Gebrauchtsabnahme für fleigende Bauten

    Version

    Technisch erstellt on 05.04.2017
    Technisch geändert on 08.01.2026

    Language version

    Deutsch

    Sprache: de
    Technisch erstellt on 07.06.2017
    Technisch geändert on 14.05.2025

    Forms

    not specified

    Prerequisites

    Further requirements are placed on the draftsman, for example with regard to qualifications and sufficient insurance coverage. The structural engineer must also have a special qualification in accordance with Section 65 (4) of the Lower Saxony Building Code (NBauO).

    not specified

    Procedure

    Instead of submitting a building application, the client submits a signed notification of the intended construction project to the competent authority. This must be accompanied by the building documents signed by the draftsman.
    Insofar as an examination of the structural evidence or the suitability of the escape routes is required, these documents can be attached to the other building documents or submitted separately to the building supervisory authority.

    Processing time

    not specified

    Costs

    Fees may apply, please contact the relevant authority.

    Notes (specifics)

    If there is any doubt as to whether an intended construction project requires a building permit or not, information can be obtained from the competent authority before the measure is carried out. Certain construction measures are non-procedural construction measures and do not require notification.

    Unterstützende Institutionen

    not specified

    Welche Dokumente resultieren aus dieser Leistung?

    not specified

    Area of validity

    Lower Saxony

    Official approval

    Officially approved by Lower Saxony Ministry of Social Affairs, Health and Equality

    Version

    Technisch erstellt on 17.08.2007
    Technisch geändert on 27.03.2026

    Keywords

    Building application, Public toilets, Toilet facilities, WC, Exemption from the building permit requirement

    Language version

    Deutsch

    Sprache: de
    Technisch erstellt on 07.06.2017
    Technisch geändert on 14.05.2025

    Englisch

    Sprache: en
    Sprachbezeichnung nativ: English
    Technisch erstellt on 22.10.2025
    Technisch geändert on 23.10.2024