Construction measures not requiring approval Notification
The construction of certain buildings and other structures in residential
residential and commercial areas is possible in individual cases without planning permission
and can be approved within the
Description
The construction of certain buildings and other structures in residential and commercial areas is possible in individual cases without a building permit and can be reported within the framework of a notification procedure.
Which buildings and other structures are permit-free construction measures and require written notification under which conditions is regulated in § 62 of the Lower Saxony Building Code (NBauO).
Since no building permit is granted, the building owner, together with the draftsman, is responsible for complying with all the requirements that the construction project must meet.
The building owner may request that a building permit procedure be carried out instead of a notification procedure. There are higher fees in the building permit process and the processing time is usually longer.
Online services
- Achim (District Verden, Lower Saxony)
- Dörverden (District Verden, Lower Saxony)
- Kirchlinteln (District Verden, Lower Saxony)
- Langwedel (District Verden, Lower Saxony)
- Municipal association Thedinghausen (District Verden, Lower Saxony)
- Ottersberg (District Verden, Lower Saxony)
- Oyten (District Verden, Lower Saxony)
Alternatively, please enter a location or postcode in the City / Location input field to see the responsible online service in this section
Competent office
The responsibility lies with the municipality, the joint municipality and the city. After checking the notification, the latter forwards it to the lower building supervisory authority for processing.
Contact point
The responsibility lies with the municipality, the joint municipality and the city. After checking the notification, the latter forwards it to the lower building supervisory authority for processing.
Contact person
Unfortunately, no contact persons were found for District Verden (Lower Saxony). Please check the service description above for information on how to find the responsible contact person.
Forms
not specified
Prerequisites
Further requirements are placed on the draftsman, for example with regard to qualifications and sufficient insurance coverage. The structural engineer must also have a special qualification in accordance with Section 65 (4) of the Lower Saxony Building Code (NBauO).
Basis for legal action
Legal remedy
not specified
Procedure
Instead of submitting a building application, the client submits a signed notification of the intended construction project to the competent authority. This must be accompanied by the building documents signed by the draftsman.
Insofar as an examination of the structural evidence or the suitability of the escape routes is required, these documents can be attached to the other building documents or submitted separately to the building supervisory authority.
Processing time
not specified
Costs
Fees may apply, please contact the relevant authority.
Notes (specifics)
If there is any doubt as to whether an intended construction project requires a building permit or not, information can be obtained from the competent authority before the measure is carried out. Certain construction measures are non-procedural construction measures and do not require notification.
Unterstützende Institutionen
not specified
Welche Dokumente resultieren aus dieser Leistung?
not specified
Area of validity
Lower Saxony
Official approval
Officially approved by Lower Saxony Ministry of Social Affairs, Health and Equality
Keywords
Building application, Public toilets, Toilet facilities, WC, Exemption from the building permit requirement