Construction measures not requiring approval Notification

    The construction of certain buildings and other structures in residential

    residential and commercial areas is possible in individual cases without planning permission

    and can be approved within the

    Description

    The construction of certain buildings and other structures in residential and commercial areas is possible in individual cases without a building permit and can be reported within the framework of a notification procedure.

    Which buildings and other structures are permit-free construction measures and require written notification under which conditions is regulated in § 62 of the Lower Saxony Building Code (NBauO).

    Since no building permit is granted, the building owner, together with the draftsman, is responsible for complying with all the requirements that the construction project must meet.

    The building owner may request that a building permit procedure be carried out instead of a notification procedure. There are higher fees in the building permit process and the processing time is usually longer.

    Online services

    Competent office

    The responsibility lies with the municipality, the joint municipality and the city. After checking the notification, the latter forwards it to the lower building supervisory authority for processing.

    Contact point

    The responsibility lies with the municipality, the joint municipality and the city. After checking the notification, the latter forwards it to the lower building supervisory authority for processing.

    Contact person

    Unfortunately, no contact persons were found for District Verden (Lower Saxony). Please check the service description above for information on how to find the responsible contact person.

    Forms

    not specified

    Prerequisites

    Further requirements are placed on the draftsman, for example with regard to qualifications and sufficient insurance coverage. The structural engineer must also have a special qualification in accordance with Section 65 (4) of the Lower Saxony Building Code (NBauO).

    not specified

    Procedure

    Instead of submitting a building application, the client submits a signed notification of the intended construction project to the competent authority. This must be accompanied by the building documents signed by the draftsman.
    Insofar as an examination of the structural evidence or the suitability of the escape routes is required, these documents can be attached to the other building documents or submitted separately to the building supervisory authority.

    Processing time

    not specified

    Costs

    Fees may apply, please contact the relevant authority.

    Notes (specifics)

    If there is any doubt as to whether an intended construction project requires a building permit or not, information can be obtained from the competent authority before the measure is carried out. Certain construction measures are non-procedural construction measures and do not require notification.

    Unterstützende Institutionen

    not specified

    Welche Dokumente resultieren aus dieser Leistung?

    not specified

    Area of validity

    Lower Saxony

    Official approval

    Officially approved by Lower Saxony Ministry of Social Affairs, Health and Equality

    Version

    Technisch erstellt on 17.08.2007
    Technisch geändert on 27.03.2026

    Keywords

    Building application, Public toilets, Toilet facilities, WC, Exemption from the building permit requirement

    Language version

    Deutsch

    Sprache: de
    Technisch erstellt on 07.06.2017
    Technisch geändert on 14.05.2025

    Englisch

    Sprache: en
    Sprachbezeichnung nativ: English
    Technisch erstellt on 22.10.2025
    Technisch geändert on 23.10.2024