Boundary determination

    If you do not know the course of your parcel boundary or if you cannot find boundary signs on your parcel boundary, you can apply for a boundary determination.

    Description

    Specific reasons for commissioning a boundary determination can be

    • an upcoming construction project near the border,
    • an unclear border,
    • a first-time marking of boundary points by boundary stones or similar (markings) or the renewal of destroyed markings or
    • a planned enclosure

    be.

    Online service

    Contacting the relevant land registry office for surveying services

    ID: L100040_453626776

    Description

    Collective survey application of the LGLN

    Use this service online

    Trust level

    You need an account with password to use this online service (trust level: low).

    further information on the level of trust for online services

    Identification

    • electronic identification using national eID means – user name/password

    Version

    Technisch erstellt on 16.05.2022
    Technisch geändert on 22.10.2024

    Language

    Deutsch

    Sprache: de
    Technisch erstellt on 07.06.2017
    Technisch geändert on 14.05.2025

    Englisch

    Sprache: en
    Sprachbezeichnung nativ: English
    Technisch erstellt on 22.10.2025
    Technisch geändert on 23.10.2024

    Competent office

    not specified

    Contact point

    On-the-spot boundary determination:

    • by the locally responsible cadastral office of the State Office for Geoinformation and Surveying of Lower Saxony (LGLN) or
    • by a publicly appointed surveyor (ÖbVI) licensed in Lower Saxony

    be in progress.

    The registration of the results of the survey in the real estate cadastre is always carried out by the local cadastral office.

    Contact person

    Niedersächsisches Landesamt für Geoinformation und Landesvermessung Niedersachsen (LGLN) - Regionaldirektion Sulingen-Verden - Regionaldirektion Sulingen-Verden - Katasteramt Verden

    Address

    address

    Eitzer Straße 34
    27283 Verden (Aller)

    Save contact

    Behindertenparkplatz: null Anzahl: 2 Gebühren: nein Parkplatz: null Anzahl: 5 Gebühren: nein

    Wheelchair access

    Opening hours

    Montag - Donnerstag: 8:00 - 12:00 Uhr und 13:30 - 15:30 Uhr Freitag und vor Feiertagen 8:00 - 12:00 Uhr und nach Vereinbarung

    Contact

    Internet

    Version

    Technisch erstellt on 28.07.2009
    Technisch geändert on 29.04.2025

    Language version

    Deutsch

    Sprache: de
    Technisch erstellt on 07.06.2017
    Technisch geändert on 14.05.2025

    Forms

    Forms Required: No

    Written form required: Yes

    Informal application possible: Yes

    Personal appearance required: No

    Online services available: Yes

    Online service: Contacting the responsible cadastral office for a surveying service

    Prerequisites

    You can submit an application for a boundary determination if you

    • Property owner
    • a person entitled to a hereditary building
    • a person with power of attorney (authorized representative) or consent of the owner or the person entitled to a leasehold
    • an authority in the performance of its tasks,

    are.

    The assumption of costs must be clearly stated.

    The declaration of liability regulates the assumption of costs by the applicant if the specified cost debtor fails.

    not specified

    Procedure

    After you have placed your order for the boundary determination, you and all parties involved (e.g. the border neighbours concerned) will be informed in writing of the start of the local surveying work.

    The existing parcel boundaries and their boundary points will be transferred to the locality to the extent necessary.
    In the process, missing boundary markers are replaced or defects in the marking are eliminated. Previously unmarketed boundary points can be permanently marked with boundary markers (demarcation).

    A boundary meeting takes place at which the parties involved have the opportunity to comment on the determined boundaries and, if necessary, the markings.

    The boundary determination and the demarcation shall be notified to the parties involved and documented in writing in an official boundary document.

    Once it has become final, you have legal certainty vis-à-vis your border neighbours about the course of the common parcel boundary. Their ownership rights to the land are secured. The boundary points are marked or, if desired, permanently signalled by boundary markers.

    Processing time

    Due to summons and appeal deadlines, it is usually two to three months.

    Costs

    The costs for determining the boundary are based on the cost regulations for official surveying(KOVerm).

    The costs depend on

    • on the number of boundary points determined and marked in the locality,
    • the land value (market value) at the time of completion of the service and
    • on expenses such as boundary stones, kilometers driven, travel expenses of employees.

    Notes (specifics)

    Unterstützende Institutionen

    not specified

    Welche Dokumente resultieren aus dieser Leistung?

    not specified

    Area of validity

    Lower Saxony

    Official approval

    Officially approved by Lower Saxony Ministry of the Interior, Sport and Digitalization, Department 75

    Version

    Technisch erstellt on 21.05.2007
    Technisch geändert on 14.04.2026

    Keywords

    Building plots, Surveying, Cadastre, Building application, Building plot, Property marketing, Surveying, Cadastral office, LGLN

    Language version

    Deutsch

    Sprache: de
    Technisch erstellt on 07.06.2017
    Technisch geändert on 14.05.2025

    Englisch

    Sprache: en
    Sprachbezeichnung nativ: English
    Technisch erstellt on 22.10.2025
    Technisch geändert on 23.10.2024