    With the exception of high-rise buildings or a part of a building not listed in the appendix to the

    Building Regulations (NBauO), the demolition of a building or the

    or the removal

    Description

    With the exception of high-rise buildings or a part of a structure not listed in the Annex to the Lower Saxony Building Regulations (NBauO), the demolition or removal of a structure does not require notification. High-rise buildings or a part of a structure not listed in the annex to the NBauO must be reported to the competent authority in accordance with Section 60 (3) NBauO.

    Irrespective of this, the stability of neighboring buildings must be checked by the building owner if they are built next to each other or if the building ground gives reason to do so.

    Online services

    There is currently no online service available for this location.

    Competent office

    Responsibility lies with the district, the independent city, the large independent city and the municipality with building supervisory powers.

    Contact point

    Responsibility lies with the district, the independent city, the large independent city and the municipality with building supervisory powers.

    Contact person

    Landkreis Wesermarsch - Dezernat 2 - Fachdienst 63 - Planen & Bauaufsicht

    Address

    address

    Poggenburger Straße 7
    26919 Brake (Unterweser)

    Save contact

    Elevator available
    Wheelchair access

    Opening hours

    Mo - Do  08:00 - 15:30 Uhr Freitag   08:00 - 12:00 Uhr und nach Vereinbarung

    Contact

    Contact person

    Internet

    Payment methods

    The following payment methods are possible:

    • SEPA transfer
    • Bill
    • Transfer
    • Cash payment

    Bank account

    Kreiskasse des Landkreises Wesermarsch

    Recipient: Kreiskasse des Landkreises Wesermarsch
    IBAN: DE17 2805 0100 0060 4005 79
    BIC: SLZODE22
    Bank institution: Landessparkasse zu Oldenburg (LzO)

    Forms

    Vollmacht für die Teilnahme am digitalen Baugenehmigungsverfahren ITeBAU

    Version

    Technisch erstellt on 05.04.2017
    Technisch geändert on 08.01.2026

    Language version

    Deutsch

    Sprache: de
    Technisch erstellt on 07.06.2017
    Technisch geändert on 14.05.2025

    Forms

    not specified

    Prerequisites

    If a permit, authorization or approval is required for the removal of the facility in accordance with other regulations, this must be obtained before the removal can begin. This depends on the individual case, e.g. according to monument protection, nature conservation or waste legislation.

    not specified

    Procedure

    The notification must be accompanied by confirmation from a structural engineer in accordance with Section 65 (4) NBauO regarding the effectiveness of the planned safety measures and the stability of the structures that are attached to the structures or parts of structures to be demolished or removed or whose stability may be affected by the construction work.

    Processing time

    not specified

    Costs

    Fees may apply. Please contact the responsible office.

    Notes (specifics)

    not specified

    Unterstützende Institutionen

    not specified

    Welche Dokumente resultieren aus dieser Leistung?

    not specified

    Area of validity

    Lower Saxony

    Official approval

    Officially approved by Lower Saxony Ministry for Social Affairs, Health and Equality

    Version

    Technisch erstellt on 21.05.2007
    Technisch geändert on 27.03.2026

    Keywords

    Demolition of buildings

    Language version

    Deutsch

    Sprache: de
    Technisch erstellt on 07.06.2017
    Technisch geändert on 14.05.2025

    Englisch

    Sprache: en
    Sprachbezeichnung nativ: English
    Technisch erstellt on 22.10.2025
    Technisch geändert on 23.10.2024