Errichtung, wesentliche Änderung oder Stilllegung einer Jauche-, Gülle- und Silagesickersaftanlage (JGS-Anlage) anzeigen

    You must notify us at least 6 weeks in advance of the construction, decommissioning or significant modification of a slurry, liquid manure and silage leachate plant (JGS plant).

    Description

    If you have a

    • silage leachate storage facility with a volume of more than 25 cubic meters,
    • any other JGS facility with a total volume of more than 500 cubic meters, or
    • a facility for the storage of solid manure or silage with a volume of more than 1,000 cubic meters, you must notify the competent authority.

    If you have a

    • plant for storing silage leachate with a volume of more than 25 cubic meters,
    • other JGS plant with a total volume of more than 500 cubic metres, or

    If you want to build, decommission or substantially modify a facility for the storage of solid manure or silage with a volume of more than 1,000 cubic metres, you must notify the competent authority.

    Online services

    There is currently no online service available for this location.

    Competent office

    not specified

    Contact point

    not specified

    Contact person

    Staatliches Gewerbeaufsichtsamt Celle

    Address

    address

    Im Werder 9
    29221 Celle

    Save contact

    Contact

    Internet

    Version

    Technisch erstellt on 17.12.2009
    Technisch geändert on 26.03.2026

    Language version

    Deutsch

    Sprache: de
    Technisch erstellt on 07.06.2017
    Technisch geändert on 14.05.2025

    Forms

    not specified

    Prerequisites

    You provide the necessary documents to prove that your system complies with the requirements of the Ordinance on Systems for Handling Substances Hazardous to Water (AwSV).

    With the required documents, you prove that your plant complies with the requirements of the Ordinance on Installations for the Handling of Water-Hazardous Substances (AwSV).

    not specified

    Procedure

    • You fill out the forms required for the notification and send them to the lower water authority by post or email or you can use the online service for the application.
    • In either case, the authority will check your documents for completeness and request any missing information or documents.
    • In addition, the content requirements will be checked, which may also result in additional claims.
    • If there are no objections, your application data will be entered into the authority's specialist procedure.
    • You fill out the forms required for the notification and send them to the lower water authority by post or e-mail or you use the online service for the application.
    • In any case, the authority will check your documents for completeness and, if necessary, request missing information or documents.
    • In addition, the content requirements are reviewed, which may also lead to additional claims.
    • If there are no objections, your application data will be entered into the authority's specialist procedure.

    Processing time

    2 to 4 weeks

    Costs

    not specified

    Notes (specifics)

    not specified

    Unterstützende Institutionen

    not specified

    Welche Dokumente resultieren aus dieser Leistung?

    not specified

    Area of validity

    Lower Saxony

    Official approval

    Officially approved by Lower Saxony Ministry for the Environment, Energy and Climate Protection on 05.12.2023

    Version

    Technisch erstellt on 11.12.2023
    Technisch geändert on 27.03.2026

    Keywords

    Display, Attachment, AwSV, Change, Fabrics, Obligation to notify, Substances hazardous to water, Handling, Significant change, System subject to mandatory inspection, hazardous to water, Hazard level, Plant safety, Water authority, Erect

    Language version

    Deutsch

    Sprache: de
    Technisch erstellt on 07.06.2017
    Technisch geändert on 14.05.2025

    Englisch

    Sprache: en
    Sprachbezeichnung nativ: English
    Technisch erstellt on 22.10.2025
    Technisch geändert on 23.10.2024