Errichtung, wesentliche Änderung oder Stilllegung einer Jauche-, Gülle- und Silagesickersaftanlage (JGS-Anlage) anzeigen
You must notify us at least 6 weeks in advance of the construction, decommissioning or significant modification of a slurry, liquid manure and silage leachate plant (JGS plant).
Description
If you have a
- silage leachate storage facility with a volume of more than 25 cubic meters,
- any other JGS facility with a total volume of more than 500 cubic meters, or
- a facility for the storage of solid manure or silage with a volume of more than 1,000 cubic meters, you must notify the competent authority.
If you have a
- plant for storing silage leachate with a volume of more than 25 cubic meters,
- other JGS plant with a total volume of more than 500 cubic metres, or
If you want to build, decommission or substantially modify a facility for the storage of solid manure or silage with a volume of more than 1,000 cubic metres, you must notify the competent authority.
Online services
There is currently no online service available for this location.
Competent office
not specified
Contact point
not specified
Contact person
Forms
not specified
Prerequisites
You provide the necessary documents to prove that your system complies with the requirements of the Ordinance on Systems for Handling Substances Hazardous to Water (AwSV).
With the required documents, you prove that your plant complies with the requirements of the Ordinance on Installations for the Handling of Water-Hazardous Substances (AwSV).
Basis for legal action
Legal remedy
not specified
Procedure
- You fill out the forms required for the notification and send them to the lower water authority by post or email or you can use the online service for the application.
- In either case, the authority will check your documents for completeness and request any missing information or documents.
- In addition, the content requirements will be checked, which may also result in additional claims.
- If there are no objections, your application data will be entered into the authority's specialist procedure.
- You fill out the forms required for the notification and send them to the lower water authority by post or e-mail or you use the online service for the application.
- In any case, the authority will check your documents for completeness and, if necessary, request missing information or documents.
- In addition, the content requirements are reviewed, which may also lead to additional claims.
- If there are no objections, your application data will be entered into the authority's specialist procedure.
Processing time
2 to 4 weeks
Costs
not specified
Notes (specifics)
not specified
Unterstützende Institutionen
not specified
Welche Dokumente resultieren aus dieser Leistung?
not specified
Area of validity
Lower Saxony
Official approval
Officially approved by Lower Saxony Ministry for the Environment, Energy and Climate Protection on 05.12.2023