Request building measurement

    If a building that is important for the real estate cadastre has been newly erected or changed in its floor plan, there is a legal obligation to arrange for a building measurement until completion of the shell.

    Description

    Ownership of land is subject to state warranty. For this reason, the Hessian offices for land management maintain a property cadastre for the state-wide verification of all land and buildings, in which the property boundaries and the building floor plans are documented in high quality and accuracy on the basis of local surveys. The real estate cadastre thus also serves to protect your personal property rights.

    In order for the Land Management Offices to be able to keep the building record in the real estate cadastre up to date at all times, the legislator has obliged the owners of newly constructed or ground-plan buildings to commission an authorised surveying body (publicly appointed surveying engineer, Office for Soil Management) with the fee-based survey. The commissioned surveying body shall initiate a corresponding procedure for this purpose.

    If the shell has been completed and the building measurement has not been commissioned despite a written request, the surveying bodies are entitled to act (ex officio) even without an order and to invoice the building owners for the costs. The surveying bodies are required to initiate a building measurement procedure ex officio even without prior written request from the building owners if they already have to carry out another survey on the property concerned upon request or if the building concerned is to be represented in a building template to be prepared by them.

    Online service

    Gebäudeeinmessung

    ID: L100001_384992951

    Description

    Mit diesem Online-Dienst können Sie eine Gebäudeeinmessung anfragen

    Use this service online

    Trust level

    You need an account with password to use this online service (trust level: low).

    further information on the level of trust for online services

    Version

    Technisch erstellt on 19.01.2023

    Technisch geändert on 19.01.2023

    Language

    Deutsch

    Sprache: de

    Technisch erstellt on 07.06.2017

    Technisch geändert on 14.05.2025

    Contact point

    Building measurements are carried out by publicly appointed surveyors approved in the state of Hesse or by the respective responsible offices for soil management.

    If you do not fulfil your obligation to commission a building measurement in time until the completion of the shell construction, these bodies can also act without an order (i.e. ex officio) after prior request and the expiry of a period of 21 days.

    Contact person

    Amt für Bodenmanagement Marburg

    Address

    address

    Robert-Koch-Straße 17

    35037 Marburg

    Save contact

    Opening hours

    Montag bis Donnerstag: 8:00 bis 12:30 Uhr und 13:30 Uhr bis 15:30 Uhr
    Freitag: 8:00 bis 12:00 Uhr
    oder nach Vereinbarung

    Contact

    telephone: +49 611 535-3000

    fax: +49 611 535-3300

    e-mail: info.afb-marburg@hvbg.hessen.de

    Internet

    Version

    Technisch geändert on 01.08.2025

    Language version

    de

    Sprache: de

    Required documents

    In the case of authorisation to apply:

    • Presentation of the corresponding power of attorney

    In the event that the costs are covered by a third party:

    • Declaration of assumption of costs

    Forms

    Forms available: No

    Written form required: No

    Informal application possible: Yes

    Personal appearance required: No

    Prerequisites

    You can submit an application for building measurement if you:

    • Building owner
    • or are authorized by the above group of persons.

    Action against the order for costs

    Procedure

    • Upon receipt of the request, a consultation will be given and, if desired, a cost estimate.
    • Preparation and coordination of a measurement date.
    • Execution of the building measurement on site.
    • Cost determination of the building measurement by the surveying office.
    • Transfer of the survey results into the real estate cadastre.
    • Cost determination of the transfer to the real estate cadastre by the Office of Land Management.
    • Sending the information on the continuation of the proof of the buildings in the real estate cadastre and a current edition of the property map

    Deadlines

    Until completion of the shell, a building measurement must be requested.

    Processing time

    The processing time is up to 8 months.

    Costs

    Note: The costs are collected uniformly by all surveying agencies according to the administrative costs regulations for the business area of the Hessian Ministry of Economics, Energy, Transport and Housing (VwKostO-MWEVW).

    Additional costs are incurred for the transfer of the survey results into the real estate cadastre.

    The amount of the fees is determined depending on the value of the building or the structural change (shell construction sum)

    Notes (specifics)

    Bemerkungen

    Measurements of buildings whose shell was demonstrably completed before the entry into force of the Hessian cadastral law of 01.01.1956 are free of charge.

    Area of validity

    Hesse

    Official approval

    Officially approved by Hessian Ministry of Economic Affairs, Energy, Transport and Housing (HMWEVW) on 28.06.2022

    Version

    Technisch erstellt on 23.10.2008

    Technisch geändert on 26.02.2025

    Keywords

    Baugenehmigung, Vermessung, Amt für Bodenmanagement, Öffentlich bestellte Vermessungsingenieurin, Öffentlich bestellter Vermessungsingenieur, Einmessungsbescheinigung, Vermessungsantrag, Gebäudeeinmessung, Gebäudeeigentümerin, Gebäude einmessen, Gebäudeeigentümer, Bauantrag, Kataster, Liegenschaftskataster, Hausbau, Gebäude, Gebäudeeinmessungspflicht, Lageplan

    Language version

    Deutsch

    Sprache: de

    Technisch erstellt on 07.06.2017

    Technisch geändert on 14.05.2025

    Englisch

    Sprache: en

    Sprachbezeichnung nativ:

    English

    Technisch erstellt on 07.07.2021

    Technisch geändert on 26.11.2019