Apply for certificate of seclusion according to the Condominium Act

    You must apply for a certificate of seclusion if you wish to establish a separate property or assert a permanent right of residence.

    Description

    If you establish separate ownership of an apartment or of rooms not used for residential purposes (e.g., commercial) or of a parking space, you will need a certificate of seclusion. You also need this if you want to assert the right to permanently occupy a certain apartment in the building (permanent right of residence).

    The certificate of seclusion proves that

    • a dwelling is sufficiently separated from other dwellings or rooms by construction, or
    • rooms not used for residential purposes (partial ownership) are closed off from other rooms.

    Special ownership can also be established for parking spaces and parts of the property outside the building, such as terraces or garden areas. The separate ownership must be clearly defined by dimension specifications in the construction drawing / partition plan.

    The certificate of seclusion is issued by the responsible building authority after checking your documents.

    Information for Marburg-Biedenkopf: Abgeschlossenheitsbescheinigung und Aufteilungsplan (Aufteilung eines Wohnhauses in Wohnungseigentum)

    Online services

    There is currently no online service available for this location.

    Competent office

    • competent building authority of the country

    Contact person

    Organisationen Marburg-Biedenkopf - Fachdienst Bauen

    Address

    address

    Im Lichtenholz 60

    35043 Marburg

    Save contact

    No elevator available

    Wheelchair access

    Opening hours

    Montag bis Freitag von 08:00 bis 14:00 Uhr und nach Vereinbarung.
    Bitte beachten Sie etwaige Ausnahmen innerhalb einzelner Bereiche bzw. bei bestimmten Leistungen der Kreisverwaltung.
    Für Leistungen der Kfz-Zulassungs- und der Fahrerlaubnisbehörde steht eine Online-Terminvereinbarung zur Verfügung. 

    Internet

    Further information

    Buslinien: Linie 2, 3 und 13 (H Schubertstraße) Linie 6 und Bus MR-81 (H Kreishaus A1) Linie 6 (H Kreishaus B2) Linie MR-80 (H Kreishaus B4)

    Version

    Technisch geändert on 24.03.2025

    Language version

    de

    Sprache: de

    Required documents

    • Application for a certificate of seclusion,
    • construction drawing / partition plan (site plan, floor plans, sections and views),
      • In the case of a written application, the construction drawing / partition plan must be enclosed in duplicate, legible and to scale and must not exceed DIN A3 format.
      • In the case of electronic application, the construction drawing / partition plan must be submitted as an electronic document printable in A3 format.
      • The construction drawing / partition plan must be an as-built drawing for existing buildings.
    • Proof of ownership (current excerpt from the land register, purchase contract if applicable, current excerpt from the commercial register if applicable),
    • current excerpt from the official real estate map

      Information for Marburg-Biedenkopf: Abgeschlossenheitsbescheinigung und Aufteilungsplan (Aufteilung eines Wohnhauses in Wohnungseigentum)

      NOTE: There is no separate application form; an informal letter requesting a certificate of completion is sufficient.

      Forms

      • Forms/ online services available: No
      • Written form required: depends on state law
      • Informal application possible: Yes
      • Personal appearance required: No

      Prerequisites

      • You must prove that you are either the owner or heritable building right holder of the apartments for which a certificate of seclusion is requested. Alternatively, you must provide credible evidence of your legitimate interest (e.g., purchaser).
      • Condominiums are deemed to be self-contained if
        • it is structurally separated from other apartments or rooms, for example by walls and ceilings, and
        • has its own lockable access directly from the outside, from a staircase or an anteroom; the access may not lead via another separate property or via a neighboring property without real security.
      • A self-contained apartment or self-contained rooms not used for residential purposes may include additional lockable rooms outside the respective enclosure (for example, storage rooms in the basement).
      • Parking spaces as well as parts of the property outside the building (such as terraces and garden areas), on which separate ownership is also to be established, must be clearly defined by dimension specifications in the construction drawing / partition plan.
      • administrative court action (the certificate of seclusion is not an administrative act)

      Procedure

      • You fill out the application and submit it to the relevant building authority together with the required documents.
      • The building authority will check your application and the documents.
      • If all requirements are met, the building authority will issue you a certificate of seclusion together with a copy of the construction drawing / partition plan.

      Deadlines

      • none

      Processing time

      • not specified

      Area of validity

      Hesse

      Official approval

      Officially approved by Ministry of the Interior, Building and Digitalization Mecklenburg-Western Pomerania on 31.03.2023

      Version

      Technisch erstellt on 21.10.2008

      Technisch geändert on 01.10.2025

      Keywords

      Aufteilung Wohnhaus, Teileigentum, Dauerwohnrecht, Eigentumswohnung, Wohnungseigentum, Sondereigentum, Aufteilung eines Wohnhauses in Wohnungseigentum

      Language version

      Deutsch

      Sprache: de

      Technisch erstellt on 07.06.2017

      Technisch geändert on 14.05.2025

      Englisch

      Sprache: en

      Sprachbezeichnung nativ:

      English

      Technisch erstellt on 07.07.2021

      Technisch geändert on 26.11.2019