Notification of the construction, significant modification or measures involving a change in the hazard level of AwSV installations (except heating oil consumer installations and JGS installations) Acceptance

    If you wish to construct or significantly modify a facility for handling substances hazardous to water or take measures that result in a change in the hazard level, you must notify us.

    Description

    You must submit your notification of the construction, significant modification or change to the hazard level of an installation subject to mandatory inspection to the competent authority in good time in advance.

    The construction of these installations does not have to be notified if

    • a suitability assessment has been applied for in accordance with the Water Resources Act for installations for the storage, filling or handling of substances hazardous to water or
    • installations are the subject of an approval procedure under other legislation, provided that the approval procedure also ensures compliance with the requirements of this Ordinance. In this case, significant changes to the installation that require approval are also not subject to notification.

    Required documents

    • Completed notification form
    • Detailed documents describing the project (site plan, drawings, certificates, descriptions)
    • Expert opinion, if applicable

    Prerequisites

    The systems must comply with the requirements of the Ordinance on Systems for Handling Substances Hazardous to Water (AwSV). This must be verified with the documents to be submitted.

    Procedure

    If you want to submit the advertisement online:

    • You submit the notification via the online service.
    • The water authority will check your documents for completeness and request any missing information or documents.
    • The content requirements are also checked, which may also result in additional requirements.
    • The authority can temporarily or permanently prohibit the project or issue a decision with conditions.

    If you wish to send the notification by letter or e-mail:

    • You fill out the forms required for the notification and send them to the lower water authority.
    • The further procedural steps correspond to the online procedure.

    Deadlines

    Please send your notification to the competent authority at least six weeks in advance.

    Processing time

    2 to 4 weeks

    Costs

    Fee from 25,00 EUR to 1.000,00 EUR

    Area of validity

    Hesse

    Official approval

    Officially approved by Ministry for Energy Transition, Climate Protection, Environment and Nature of the State of Schleswig-Holstein on 05.07.2023

    Version

    Technisch erstellt on 07.12.2023

    Technisch geändert on 25.06.2024

    Keywords

    Anzeige, Gefährdungsstufe, wesentliche Änderung, Stoffe, Errichten, Anzeigepflicht, Anlage, Prüfpflichtige Anlage, Wassergefährdende Stoffe, Anlagensicherheit, Umgang, Wasserbehörde, ändern, wassergefährdend, melden, AwSV

    Language version

    Deutsch

    Sprache: de

    Technisch erstellt on 07.06.2017

    Technisch geändert on 14.05.2025

    Englisch

    Sprache: en

    Sprachbezeichnung nativ:

    English

    Technisch erstellt on 07.07.2021

    Technisch geändert on 26.11.2019