Applying for planning permission for a change of use of a facility using the simplified procedure

    If you want to change the use of installations that require planning permission but do not require approval and are not exempt from approval, you can submit an application using the simplified procedure.

    Description

    If the approved use of a building is changed, this change of use - even if no structural changes are made - generally requires planning permission, i.e. a corresponding building permit must be obtained before the new use can commence.

    Exceptions:

    • changes of use that do not require a procedure as defined in Annex III to Section 63 HBO or
    • Possibility of carrying out an approval exemption procedure if the requirements specified in § 64 Para. 1 HBO are met

    If a building permit procedure is to be carried out, the building permit for a change of use is usually granted in a simplified building permit procedure.

    The building permit expires if you do not start construction work within 3 years of the permit being granted or if construction work has been interrupted for one year after this period. The period can be extended by up to 2 years in each case, even several times, with a written application.

    Online services

    There is currently no online service available for this location.

    Contact point

    Please contact the lower building supervisory authority (building supervisory authorities of the districts, independent cities and special status cities).

    Contact person

    Unfortunately, no contact persons were found for Lohra (District Marburg-Biedenkopf, Hesse). Please check the service description above for information on how to find the responsible contact person.

    Required documents

    In addition to the building application, the documents required for the assessment of the project and the processing of the building application must be submitted to the lower building supervisory authority in analog/digital form.

    These documents can be, for example

    • Site plan
    • Extract from the official real estate map
    • Building description
    • construction drawings

    The documents to be submitted can be found in the Hessian Building Documents Decree.

    The structural engineering certificates must be submitted to the building inspectorate prior to the execution of the respective construction phases, the building documents not subject to mandatory inspection prior to the start of construction.

    An appeal may be lodged against the authority's decision within one month of notification.

    Procedure

    • You complete the application digitally in the building portal or in analog form and submit it together with the required documents to the responsible building authority
    • The building authority checks your application and the documents
    • If all requirements are met, the building authority will grant you the permit

    Processing time

    The duration of the procedure depends on the individual case, including which agencies need to be involved. As a rule, the procedure takes a maximum of 3 months.

    The procedure can only be extended by 2 months if there are special circumstances.

    The building application is deemed to have been approved if no decision has been made within this period.

    Costs

    Fee from 100,00 EUR to 3.500,00 EUR

    Area of validity

    Hesse

    Official approval

    Officially approved by Hessian Ministry of Economics, Energy, Transport and Housing on 02.11.2023

    Version

    Technisch erstellt on 03.11.2023

    Technisch geändert on 08.07.2024

    Keywords

    Nutzungsänderung baulicher Anlagen, Bauantrag, vereinfachtes Baugenehmigungsverfahren, Änderung Nutzungsart

    Language version

    Deutsch

    Sprache: de

    Technisch erstellt on 07.06.2017

    Technisch geändert on 14.05.2025

    Englisch

    Sprache: en

    Sprachbezeichnung nativ:

    English

    Technisch erstellt on 07.07.2021

    Technisch geändert on 26.11.2019