Display operation or significant change in operation of dental, medical and veterinary X-ray equipment
If you intend to operate an X-ray facility for which notification is sufficient in accordance with Section 19 (1) or to make significant changes to it, you are obliged to notify the competent authority of this at least four weeks before the intended start.
Description
If you intend to operate an X-ray facility in accordance with Section 19 (1) or plan to make significant changes to the operation of an existing and notified X-ray facility, you must notify the competent authority.
The competent authority must be notified in writing at least four weeks before the intended start.
After expiry of this period, the notifying party may operate the X-ray facility unless the authority suspends the procedure or prohibits operation.
The holder of a notification may be a partnership with legal capacity, a legal entity or a natural person. The notification always refers to the person responsible for radiation protection. If there are changes in the radiation protection organization, please contact the competent authority to discuss or arrange further steps.
Competent office
- Darmstadt Regional Council
Department Environment Darmstadt
Department IV / Da 43.1 - Radiation protection, immission control (surface treatment, storage facilities)
- Darmstadt Regional Council
Department Environment Frankfurt
Department IV/F 43.3 - Radiation protection, chemicals legislation
- Darmstadt Regional Council
Environment Department Wiesbaden
IV/Wi 43.1 - Radiation protection, immission control (metal)
- Regional Council Giessen
Department IV Environment
Department 44.2 Genetic Engineering and Radiation Protection
- Regional Council Kassel
Department III Environmental Protection
Department 33.1 Immission and Radiation Protection
Contact point
Regional Councils, Environment Department
Contact person
Regierungspräsidium Darmstadt - Dezernat IV / F 43.3 - Strahlenschutz, Chemikalienrecht
Address
address
Haltestellen
- Haltestelle: Hauptbahnhof, Südseite
Linien:- S-Bahn: Linie diverse Linien
- Bus: Linie diverse Linien
- Regionalbahn: Linie diverse Linien
- Straßenbahn: Linie diverse Linien
Opening hours
Das Regierungspräsidium ist montags bis donnerstags von 8 bis 16:30 Uhr und freitags von 8 bis 15 Uhr telefonisch erreichbar.
Bitte erkundigen Sie sich vor Ihrem Besuch über die Öffnungszeiten und ob eine Terminvereinbarung notwendig ist.
Contact
telephone: +49 69 2714-5992
fax: +49 69 2714-5950
e-mail: Strahlenschutz-F@rpda.hessen.de
e-mail: chemikalienrecht@rpda.hessen.de
Required documents
The list of documents required for notification in accordance with Section 19 (1) can be found in Section 19 (3) of the Act on Protection against the Harmful Effects of Ionizing Radiation (StrlSchG)
In particular
- Proof of expertise and, if necessary, updates for the radiation protection officer if no radiation protection officer is available
- Proof of expertise and, if necessary, updates for the radiation protection officer
- Certificate and the expert test report in accordance with SV RL Röntgen
- Floor plan sketch of the X-ray room and adjacent rooms
- Type approval
Forms
Forms available: Yes
Written form required: Yes
Informal application possible: No
Personal appearance necessary: No
Prerequisites
You either want
1. operate an X-ray device
a) whose X-ray source is type-approved in accordance with § 45 paragraph 1 number 2,
b) the manufacture and first placing on the market of which falls within the scope of the Medical Devices Act, or
c) whose manufacture and placing on the market falls within the scope of Regulation (EU) 2017/745 of the European Parliament and of the Council of April 5, 2017 on medical devices, amending Directive 2001/83/EC, Regulation (EC) No 178/2002 and Regulation (EC) No 1223/2009 and repealing Council Directives 90/385/EEC and 93/42/EEC (OJ L 117, 5.5.2017, p. 1; L 117, 3.5.2019, p. 9; L 334, 27.12.2019, p. 165),
(d) which has been placed on the market for the first time in accordance with the provisions of the Medical Devices Act and is not used in connection with medical exposures; or
2. you wish to operate a basic, high or full protection device or a school X-ray device; or
3. you wish to significantly change the operation of such a notified X-ray device and you have a license in accordance with §15 StrlSchG.
Basis for legal action
Procedure
- You submit a written notification to the competent authority. In it, you declare whether you are operating or significantly modifying dental, medical and veterinary X-ray equipment.
- The notification must be submitted before the X-ray equipment is put into operation or significantly modified.
- The competent authority will check the documents and send you a notification confirmation with a fee notice.
Deadlines
Application deadline: 4 weeks (before commissioning the X-ray equipment)
Processing time
4 weeks (Depending on the scope of the application and completeness of the documents. Usually within 4 weeks)
Costs
Method of payment: Bank transfer: Administrative fine 200,00 EUR (Information on cost composition can be found here)
Notes (specifics)
The following information is available:
Notification must be obtained before the X-ray equipment is put into operation. The same applies to the planning of significant changes.
- For people and the environment - Radiation protectionOptional additional information on the linked website: Further information on the subject of radiation protection can be found on the following homepage
Area of validity
Hesse
Official approval
Officially approved by Hessian Ministry for the Environment, Climate Protection, Agriculture and Consumer Protection (HMUKLV) Department II 8 "Radiation protection, large accelerators, emergency protection" on 27.09.2023
Keywords
Röntgengeräte, Medizin, Röntgenanlage, Bauartzulassung, Basisschutzröntgengeräte, Vollschutzröntgengeräte, Schulröntgengeräte, Röntgeneinrichtung, Zahnmedizin, Anzeige, Tiermedizin, Hochschutzröntgengeräte