Apply for type approval for structures with a specific system
If you want to erect structures in the same design or with a specific system in several locations, you can obtain a permit for this type of structure under certain conditions.
Description
For structures that are to be erected in the same design at several locations, a type approval will be granted by the Giessen Regional Council on application under certain conditions if the structures or parts of structures meet the requirements of the legal basis or regulations issued on the basis of this Act.
A type approval can also be granted for structures that are to be erected in different designs but according to a certain system and from certain components at several locations (facilitation of serial and modular construction).
Competent office
Department 32 - Type Approval of the Giessen Regional Council is responsible.
Contact point
Please contact the Giessen Regional Council, Department 32 - Type Approval.
Contact person
Unfortunately, no contact persons were found for Friedberg (Hessen) (District Wetteraukreis). Please check the service description above for information on how to find the responsible contact person.
Required documents
- Application
- Proof of stability including the fire resistance duration of load-bearing components, preventive fire protection, sound insulation and thermal insulation
- Verification for energy generation systems
Prerequisites
- The structures must be erected in the same design at several locations.
- The structures or parts of the structures meet the requirements of the legal bases.
- If the structures are built in different designs, they must at least be built according to a certain system and from certain components (facilitation of serial and modular construction)
Basis for legal action
Legal remedy
You can file an administrative appeal within one month of notification.
Procedure
- You fill out the form and submit it together with the required documents to the responsible building authority (send it to the functional mailbox)
- The building authority (RP Gießen) checks your application and the documents
- If all requirements are met, the building authority will issue the type approval
Deadlines
Period of validity: 5 years (The type approval can be extended for up to five years at a time. It does not release you from the obligation of a building inspection procedure.)
Costs
The amount of the fees depends on the structural costs of the building.
Notes (specifics)
There are no indications or special features.
Further Information
Area of validity
Hesse
Official approval
Officially approved by Hessian Ministry of Economics, Energy, Transport and Housing (HMWEVW) on 27.09.2023
Keywords
Standsicherheit, Modulares Bauen, Unterschiedliche Ausführung, Bestimmtes System, Gleiche Ausführung, Bauliche Anlage, Serielles Bauen, An mehreren Stellen, Brandschutz, Systembau, Typengenehmigung