Applying for a permit under hazardous incident law for the construction and operation or modification of an installation that does not require a permit

    If you are planning an accident-relevant construction and operation or an accident-relevant change to an installation that does not require a permit and is an operating area or part of an operating area, you may require a permit.

    Description

    Do you want to construct, operate or modify a facility that does not require a permit and is part of the operating area or is part of an operating area?

    Then you need a permit if it is an accident-relevant change and the appropriate safety distance is not maintained for the first time, is further reduced or a significant increase in risk is triggered, Did the competent authority determine during the review of your previous notification of an accident-relevant construction or change that your project has the above-mentioned effects? Then you also require a permit.

    Competent office

    The environmental department of the regional council responsible for the plant location is responsible.

    Contact person

    Regierungspräsidium Darmstadt - Dezernat IV / Da 43.3 - Immissionsschutz (Energie, Bau/Lärm)

    Address

    postal address

    64278 Darmstadt

    address

    Wilhelminenstraße 1-3

    64283 Darmstadt

    Save contact

    Haltestellen

    • Haltestelle: Luisenplatz
      Linien:
      • Straßenbahn: Linie 2, 3, 6, 7, 8, 9
      • Bus: Linie F/FU, H, K, L, R, NHX, 673, X69, X71, X74, X78, M01, GB, RH, 671, 672, WE1/WE2, n71, AIR

    Elevator available

    Wheelchair access

    Opening hours

    Mo. - Do.: 08:00 - 16:30 Uhr
    Freitag: 08:00 - 15:00 Uhr

    Contact

    telephone: +49 6151 12-6369

    fax: +49 6151 12-3700

    e-mail: immissionsschutz-da-433@rpda.hessen.de

    Version

    Technisch geändert on 07.05.2025

    Language version

    de

    Sprache: de

    Regierungspräsidium Darmstadt - Dezernat IV / Da 43.2 - Immissionsschutz (Chemie)

    Address

    postal address

    64278 Darmstadt

    address

    Wilhelminenstraße 1-3

    64283 Darmstadt

    Save contact

    Haltestellen

    • Haltestelle: Luisenplatz
      Linien:
      • Straßenbahn: Linie 2, 3, 6, 7, 8, 9
      • Bus: Linie F/FU, H, K, L, R, NHX, 673, X69, X71, X74, X78, M01, GB, RH, 671, 672, WE1/WE2, n71, AIR

    Elevator available

    Wheelchair access

    Opening hours

    Das Regierungspräsidium ist montags bis donnerstags von 8 bis 16:30 Uhr und freitags von 8 bis 15 Uhr telefonisch erreichbar.

    Bitte erkundigen Sie sich vor Ihrem Besuch über die Öffnungszeiten und ob eine Terminvereinbarung notwendig ist.

    Contact

    telephone: +49 6151 12-3759

    Version

    Technisch geändert on 07.05.2025

    Language version

    de

    Sprache: de

    Regierungspräsidium Darmstadt - Dezernat IV / Da 43.1 - Strahlenschutz, Immissionsschutz (Oberflächenbehandlung, Läger)

    Address

    postal address

    64278 Darmstadt

    address

    Wilhelminenstraße 1-3

    64283 Darmstadt

    Save contact

    Haltestellen

    • Haltestelle: Luisenplatz
      Linien:
      • Straßenbahn: Linie 2, 3, 6, 7, 8, 9
      • Bus: Linie F/FU, H, K, L, R, NHX, 673, X69, X71, X74, X78, M01, GB, RH, 671, 672, WE1/WE2, n71, AIR

    Elevator available

    Wheelchair access

    Opening hours

    Mo: - Do: 08:00 - 16:30 Uhr
    Freitag: 08:00 - 15:00 Uhr

    Contact

    telephone: +49 6151 12-6849

    fax: +49 6151 12-3700

    e-mail: Immissionsschutz-Da@rpda.hessen.de

    Keywords

    Strahlen- und Immissionsschutz - Servicestelle Standort Darmstadt

    Version

    Technisch geändert on 07.05.2025

    Language version

    de

    Sprache: de

    Regierungspräsidium Darmstadt - Dezernat IV / Da 42.2 - Abfallwirtschaft - Anlagen

    Address

    postal address

    64278 Darmstadt

    address

    Wilhelminenstraße 1-3

    64283 Darmstadt

    Save contact

    Haltestellen

    • Haltestelle: Luisenplatz
      Linien:
      • Straßenbahn: Linie 2, 3, 6, 7, 8, 9
      • Bus: Linie F/FU, H, K, L, R, NHX, 673, X69, X71, X74, X78, M01, GB, RH, 671, 672, WE1/WE2, n71, AIR

    Elevator available

    Wheelchair access

    Opening hours

    Das Regierungspräsidium ist montags bis donnerstags von 8 bis 16:30 Uhr und freitags von 8 bis 15 Uhr telefonisch erreichbar.

    Bitte erkundigen Sie sich vor Ihrem Besuch über die Öffnungszeiten und ob eine Terminvereinbarung notwendig ist.

    Contact

    telephone: +49 6151 12-8701

    Version

    Technisch geändert on 07.05.2025

    Language version

    de

    Sprache: de

    Required documents

    The forms and instructions are available to download online.

    Prerequisites

    • The installation must not have any harmful effects on the environment that are technically avoidable.
    • Unavoidable harmful environmental impacts of the installation must be kept to a minimum in accordance with the state of the art.
    • The waste generated during operation of the plant must be disposed of properly.
    • Other regulations under public law and occupational health and safety concerns must not conflict with the project.

    Action before the administrative court or administrative court of justice

    Procedure

    • The approval procedure requires a written or electronic application, which must be accompanied by the drawings, explanations and other documents required to check the approval requirements.
    • If the application is complete, it must be made public together with the documents and then displayed for one month. At the latest at the same time as the public announcement of the project, the approval authority shall simultaneously request the authorities to be involved to submit their comments on the approval requirements within one month.
    • Once the licensing authority has determined all the circumstances that are relevant to the granting of a license, a decision shall be made on the application. The approval notice must be justified in writing and will be sent to you and the persons who have raised objections. The notification of the approval notice to objectors can be replaced by a public announcement.

    Deadlines

    The notification must be received before the system is installed, operated or modified.

    Processing time

    6 to 7 months (The competent authority must decide on a modification within six months and on the construction and operation within seven months.)

    Costs

    Further costs may be incurred: Fee from 2.500,00 EUR to 1.800.000,00 EUR

    Notes (specifics)

    Approval is not required if you have already ensured the appropriate safety distance in the spatially significant planning or measure by means of binding specifications.

    Further Information

    Area of validity

    Hesse

    Official approval

    Officially approved by Hessian Ministry of Agriculture and Environment, Viticulture, Forestry, Hunting and Homeland on 02.01.2024

    Version

    Technisch erstellt on 23.05.2023

    Technisch geändert on 08.07.2024

    Keywords

    Bestandteil eines Betriebsbereiches, Anlage ändern, Genehmigung, Betriebsbereich, Störfallrechtliches Genehmigungsverfahren, Immissionsschutz, Nicht genehmigungsbedürftige Anlage

    Language version

    Deutsch

    Sprache: de

    Technisch erstellt on 07.06.2017

    Technisch geändert on 14.05.2025

    Englisch

    Sprache: en

    Sprachbezeichnung nativ:

    English

    Technisch erstellt on 07.07.2021

    Technisch geändert on 26.11.2019