Applying for approval for accident-relevant changes to an installation requiring approval

    If you intend to make changes to an installation that requires a permit, you must first apply for a permit from the responsible authority.

    Description

    Do you operate an installation that is subject to immission control licensing and constitutes an operating area or is part of an operating area, and are you planning to make changes to the installation that are relevant to incidents, as a result of which the appropriate safety distance to neighboring protected objects is undercut for the first time, the safety distance that has already been undercut is undercut even further or a significant increase in risk is triggered?

    These projects may result in the modification triggering a significant increase in risk from the installation or other immission control requirements may no longer be guaranteed. Against this background, the immission control authority must review these changes. To do this, you must submit an application for a modification permit and submit all the documents required for the assessment.

    The application can be made in writing or electronically. However, approval is not required if and to the extent that the requirement to maintain an appropriate safety distance is already taken into account at the level of a spatially significant plan or measure by means of binding specifications.

    Competent office

    The environmental department of the regional council responsible for the plant location is responsible.

    Contact person

    Regierungspräsidium Gießen - Dezernat 43.1 - Immissionsschutz I

    Address

    address

    Marburger Straße 91

    35338 Gießen

    Save contact

    Contact

    telephone: +49 641 303-0(Zentrale)

    fax: +49 641 303-2197

    e-mail: verwaltungsportal.AbtIV@rpgi.hessen.de

    Internet

    Version

    Technisch geändert on 12.02.2026

    Language version

    de

    Sprache: de

    Regierungspräsidium Gießen - Dezernat 44.1 - Bergaufsicht

    Address

    address

    (Hauptgebäude/Fristenbriefkasten)

    Landgraf-Philipp-Platz 1 - 7

    35390 Gießen

    Save contact

    postal address

    Post office box 10 08 51

    35338 Gießen

    address

    (Besucheradresse)

    Marburger Straße 91

    35396 Gießen

    Save contact

    Opening hours

    Das Regierungspräsidium Gießen ist täglich telefonisch erreichbar:

    montags - donnerstags 08:00 - 16:30 Uhr
    freitags 08:00 - 15:00 Uhr

    Für einen persönlichen Besuch vereinbaren Sie bitte einen Termin.

    Contact

    telephone: +49 641 303-0(Zentrale)

    fax: +49 641 303-2197

    e-mail: verwaltungsportal.AbtIV@rpgi.hessen.de

    Internet

    Version

    Technisch geändert on 12.02.2026

    Language version

    de

    Sprache: de

    Regierungspräsidium Gießen - Dezernat 43.2 - Immissionsschutz II

    Address

    address

    (Hauptgebäude/Fristenbriefkasten)

    Landgraf-Philipp-Platz 1 - 7

    35390 Gießen

    Save contact

    postal address

    Post office box 10 08 51

    35338 Gießen

    address

    (Besucheradresse)

    Marburger Straße 91

    35396 Gießen

    Save contact

    Contact

    telephone: +49 641 303-0(Zentrale)

    fax: +49 641 303-2197

    e-mail: verwaltungsportal.AbtIV@rpgi.hessen.de

    Internet

    Version

    Technisch geändert on 12.02.2026

    Language version

    de

    Sprache: de

    Regierungspräsidium Gießen - Dezernat 42.2 - Kommunale Abfallwirtschaft/Abfallentsorgungsanlagen

    Address

    address

    Marburger Straße 91

    35396 Gießen

    Save contact

    Contact

    Version

    Technisch geändert on 12.02.2026

    Language version

    de

    Sprache: de

    Required documents

    Application documents according to legal basis
    The forms and instructions are available online for download:

    Prerequisites

    Approval for change shall be granted if:

    • it is ensured that the obligations arising from the requirements of the Federal Immission Control Act and the Federal Immission Control Ordinance are fulfilled and
    • other public law regulations and occupational health and safety concerns do not conflict with the construction and operation of the plant.

    Action before the administrative court or administrative court of justice

    Procedure

    The approval procedure requires a written or electronic application, which must be accompanied by the drawings, explanations and other documents required to check the approval requirements.

    If the application is complete, it must be made public together with the documents and then displayed for one month. At the latest at the same time as the public announcement of the project, the licensing authority shall simultaneously request the authorities to be involved to submit their comments on the licensing requirements within one month.

    If there are objections, these will be discussed with you and those who have raised the objections in a meeting. Once the licensing authority has determined all the circumstances that are relevant to the granting of a license, a decision must be made on the application.

    The approval decision must be substantiated in writing and will be served to you and the persons who have raised objections. The notification of the approval notice to objectors can be replaced by a public announcement.

    Deadlines

    There is no deadline.

    Processing time

    6 months (The duration can be extended by the authority.)

    Costs

    Further costs may be incurred.: Fee from 2.500,00 EUR to 1.800.000,00 EUR

    Further Information

    Area of validity

    Hesse

    Official approval

    Officially approved by Hessian Ministry of Agriculture and Environment, Viticulture, Forestry, Hunting and Homeland on 02.01.2024

    Version

    Technisch erstellt on 23.05.2023

    Technisch geändert on 14.05.2025

    Keywords

    Anlage ist Betriebsbereich, Störfallrelevante Änderung, Erhebliche Gefahrenerhöhung, Anlage Bestandteil Betriebsbereichs, Unterschreitung angemessenen Sicherheitsabstands

    Language version

    Deutsch

    Sprache: de

    Technisch erstellt on 07.06.2017

    Technisch geändert on 14.05.2025

    Englisch

    Sprache: en

    Sprachbezeichnung nativ:

    English

    Technisch erstellt on 07.07.2021

    Technisch geändert on 26.11.2019