Display system requiring approval for the first time due to change in law

    If you erect or have erected and operate an installation that now requires a permit and this installation did not previously require a permit, you must notify the competent authority within three months of the change in the law.

    Description

    An installation that does not require a permit and that has already been erected or whose erection or significant modification has already begun becomes subject to a permit when it is included in the list of installations requiring a permit in the ordinance (4th BImSchV).

    In this case, the installation is subject to the approval requirements under immission control law and must be notified to the competent authority within three months of the respective 4th Federal Immission Control Ordinance coming into force.

    Competent office

    The environmental department of the regional council responsible for the plant location is responsible.

    Contact person

    Regierungspräsidium Gießen - Dezernat 43.1 - Immissionsschutz I

    Address

    address

    Marburger Straße 91

    35338 Gießen

    Save contact

    Contact

    telephone: +49 641 303-0(Zentrale)

    fax: +49 641 303-2197

    e-mail: verwaltungsportal.AbtIV@rpgi.hessen.de

    Internet

    Version

    Technisch geändert on 12.02.2026

    Language version

    de

    Sprache: de

    Regierungspräsidium Gießen - Dezernat 44.1 - Bergaufsicht

    Address

    address

    (Hauptgebäude/Fristenbriefkasten)

    Landgraf-Philipp-Platz 1 - 7

    35390 Gießen

    Save contact

    postal address

    Post office box 10 08 51

    35338 Gießen

    address

    (Besucheradresse)

    Marburger Straße 91

    35396 Gießen

    Save contact

    Opening hours

    Das Regierungspräsidium Gießen ist täglich telefonisch erreichbar:

    montags - donnerstags 08:00 - 16:30 Uhr
    freitags 08:00 - 15:00 Uhr

    Für einen persönlichen Besuch vereinbaren Sie bitte einen Termin.

    Contact

    telephone: +49 641 303-0(Zentrale)

    fax: +49 641 303-2197

    e-mail: verwaltungsportal.AbtIV@rpgi.hessen.de

    Internet

    Version

    Technisch geändert on 12.02.2026

    Language version

    de

    Sprache: de

    Regierungspräsidium Gießen - Dezernat 43.2 - Immissionsschutz II

    Address

    address

    (Hauptgebäude/Fristenbriefkasten)

    Landgraf-Philipp-Platz 1 - 7

    35390 Gießen

    Save contact

    postal address

    Post office box 10 08 51

    35338 Gießen

    address

    (Besucheradresse)

    Marburger Straße 91

    35396 Gießen

    Save contact

    Contact

    telephone: +49 641 303-0(Zentrale)

    fax: +49 641 303-2197

    e-mail: verwaltungsportal.AbtIV@rpgi.hessen.de

    Internet

    Version

    Technisch geändert on 12.02.2026

    Language version

    de

    Sprache: de

    Regierungspräsidium Gießen - Dezernat 42.2 - Kommunale Abfallwirtschaft/Abfallentsorgungsanlagen

    Address

    address

    Marburger Straße 91

    35396 Gießen

    Save contact

    Contact

    Version

    Technisch geändert on 12.02.2026

    Language version

    de

    Sprache: de

    Required documents

    • Application documents analogous to BISchG
    • Forms and instructions can be found at

    Prerequisites

    • This is a notification obligation. As the operator of the installation, you comply with this obligation if you submit the notification to the competent authority by the deadline.
    • If the required documents are not already submitted with the notification, you can submit them to the competent authority within a further two months.

    Action before the administrative court or administrative court of justice

    Procedure

    • You notify the installation to the competent authority within three months of the entry into force of the respective ordinance in which your installation was included in the list of installations requiring approval.
    • You enclose the required documents. Alternatively, you can also submit the documents to the competent authority within a further two months of the notification.
    • The competent authority will confirm receipt in writing or electronically. If necessary, the authority will request further documents.
    • The competent authority may also impose additional orders on you to ensure that your installation fulfills the obligations of an installation requiring a permit under the Federal Immission Control Act or that other public law regulations and concerns do not conflict with the construction and operation of the installation.

    Deadlines

    Application deadline: 3 months (The application must be submitted within 3 months of the respective 4th BImSchV coming into force.)

    Processing time

    1 month (The competent authority must respond to your notification within one month of receiving it in full.)

    Further Information

    Area of validity

    Hesse

    Official approval

    Officially approved by Hessian Ministry of Agriculture and Environment, Viticulture, Forestry, Hunting and Homeland on 23.01.2023

    Version

    Technisch erstellt on 23.05.2023

    Technisch geändert on 08.07.2024

    Keywords

    4te BImSchV, Katalog genehmigungsbedürftiger Anlagen, genehmigungsbedürftige Anlage, Nicht genehmigungsbedürftige Anlage, Genehmigungsbedürftig nach Gesetzesänderung, Anhang 1

    Language version

    Deutsch

    Sprache: de

    Technisch erstellt on 07.06.2017

    Technisch geändert on 14.05.2025

    Englisch

    Sprache: en

    Sprachbezeichnung nativ:

    English

    Technisch erstellt on 07.07.2021

    Technisch geändert on 26.11.2019