Preliminary decision on a plant requiring a permit in accordance with the Federal Immission Control Act (BImSchG)

    If you submit an application for a preliminary decision on an installation requiring a permit, the competent authority should approve it under certain conditions.

    Description

    After your application for a preliminary decision, the competent authority decides on individual approval requirements as well as on the location of the plant.

    If the effects of the planned installation can be adequately assessed and there is a legitimate interest in issuing a preliminary decision, the competent authority should issue a preliminary decision. The preliminary decision becomes invalid if you have not applied for approval within two years.

    Competent office

    Zuständig ist die Umweltabteilung des für den Anlagenstandort zuständigen Regierungspräsidiums.
     

    Contact person

    Regierungspräsidium Darmstadt - Dezernat IV / F 43.4 - Immissionsschutz (Metall)

    Address

    address

    Gutleutstraße 114

    60327 Frankfurt am Main

    Save contact

    Opening hours

    Das Regierungspräsidium ist montags bis donnerstags von 8 bis 16:30 Uhr und freitags von 8 bis 15 Uhr telefonisch erreichbar.

    Bitte erkundigen Sie sich vor Ihrem Besuch über die Öffnungszeiten und ob eine Terminvereinbarung notwendig ist.

    Contact

    telephone: +49 69 2714-5993

    fax: +49 69 2714-5906

    e-mail: Poststelle_IV_F@rpda.hessen.de

    Version

    Technisch geändert on 20.01.2025

    Language version

    de

    Sprache: de

    Regierungspräsidium Darmstadt - Dezernat IV / F 43.2 - Immissionsschutz (Chemie)

    Address

    address

    Gutleutstraße 114

    60327 Frankfurt am Main

    Save contact

    Haltestellen

    • Haltestelle: Hauptbahnhof, Südseite
      Linien:
      • S-Bahn: Linie diverse Linien
      • Bus: Linie diverse Linien
      • Regionalbahn: Linie diverse Linien
      • Straßenbahn: Linie diverse Linien

    Opening hours

    Das Regierungspräsidium ist montags bis donnerstags von 8 bis 16:30 Uhr und freitags von 8 bis 15 Uhr telefonisch erreichbar.

    Bitte erkundigen Sie sich vor Ihrem Besuch über die Öffnungszeiten und ob eine Terminvereinbarung notwendig ist.

    Contact

    Version

    Technisch geändert on 02.05.2025

    Language version

    de

    Sprache: de

    Regierungspräsidium Darmstadt - Dezernat IV / F 43.1 - Immissionsschutz (Energie, Lärmschutz)

    Address

    address

    Gutleutstraße 114

    60327 Frankfurt am Main

    Save contact

    Haltestellen

    • Haltestelle: Hauptbahnhof, Südseite
      Linien:
      • S-Bahn: Linie diverse Linien
      • Bus: Linie diverse Linien
      • Regionalbahn: Linie diverse Linien
      • Straßenbahn: Linie diverse Linien

    Opening hours

    Das Regierungspräsidium ist montags bis donnerstags von 8 bis 16:30 Uhr und freitags von 8 bis 15 Uhr telefonisch erreichbar.

    Bitte erkundigen Sie sich vor Ihrem Besuch über die Öffnungszeiten und ob eine Terminvereinbarung notwendig ist.

    Contact

    telephone: +49 69 2714-5990

    fax: +49 69 2714-5906

    e-mail: Poststelle_IV_F@rpda.hessen.de

    Version

    Technisch geändert on 02.05.2025

    Language version

    de

    Sprache: de

    Required documents

    • Required drawings, plans, expert opinions
    • Explanations and
    • other documents (if necessary, ask the competent authority).

    Prerequisites

    • From the application you have submitted, as well as the required documents, it must be possible to adequately assess the effects of the planned plant.
    • In addition, your application must show a legitimate interest in the issuance of a preliminary decision.
    • If a preliminary decision is issued, you must apply for approval within two years of the preliminary decision becoming final. The deadline may be extended to four years upon request.
    • Contradiction
    • Complaint

    Procedure

    • If you would like to receive a preliminary decision on a plant requiring a permit, you must submit a written application in advance to the competent authority.
    • The application must be accompanied by drawings, explanations and the justified choice of location required to check the prerequisites.
    • The competent authority shall decide whether to issue the preliminary ruling.
    • You will receive a decision on the granting or rejection of the preliminary decision.
    • The preliminary decision becomes invalid if you do not apply for approval of the installation within two years. The deadline may be extended to four years upon request.

    Deadlines

    Period of validity: 2 years (The preliminary decision becomes invalid if you do not apply for approval of the installation within two years. In justified exceptional cases, the period of validity of the preliminary decision may be extended for up to two further years.)

    Processing time

    3 to 7 months (There is no legal deadline for the preliminary ruling procedure. The simplified approval procedure can be used as a guide. This is subject to a period of three months with a maximum of three months of extension.)

    Costs

    Es können weitere Kosten anfallen.: Fee from 600,00 EUR to 450.000,00 EUR

    Further Information

    Area of validity

    Hesse

    Official approval

    Officially approved by Saxon State Ministry of Energy, Climate Protection, Environment and Agriculture (SMEKUL) on 02.01.2024

    Version

    Technisch erstellt on 23.05.2023

    Technisch geändert on 14.05.2025

    Keywords

    Anlagenstandort, Voraussetzungen Genehmigung, Genehmigungsvoraussetzungen, Standort Anlage, Immissionsschutz, Vorbescheid zur Genehmigung, Standortwahl Anlage

    Language version

    Deutsch

    Sprache: de

    Technisch erstellt on 07.06.2017

    Technisch geändert on 14.05.2025

    Englisch

    Sprache: en

    Sprachbezeichnung nativ:

    English

    Technisch erstellt on 07.07.2021

    Technisch geändert on 26.11.2019