Partial authorisation for the construction of an installation Grant
If you want to build and/or operate part of a new plant, you must apply for a partial permit from the competent authority.
Description
If you want to build and/or operate a part of a plant which, due to its nature or operation, is particularly likely to cause harmful environmental effects or otherwise endanger, significantly disadvantage or significantly nuisance the general public or the neighborhood, you need a partial permit from the competent authority. The authority examines whether there is a legitimate interest in the construction and operation. After a complete examination by the authority, you will receive the decision in the form of a notice.
Competent office
Zuständig ist die Umweltabteilung des für den Anlagenstandort zuständigen Regierungspräsidiums.
Contact person
Regierungspräsidium Darmstadt - Dezernat IV / F 43.4 - Immissionsschutz (Metall)
Address
address
Opening hours
Das Regierungspräsidium ist montags bis donnerstags von 8 bis 16:30 Uhr und freitags von 8 bis 15 Uhr telefonisch erreichbar.
Bitte erkundigen Sie sich vor Ihrem Besuch über die Öffnungszeiten und ob eine Terminvereinbarung notwendig ist.
Contact
Regierungspräsidium Darmstadt - Dezernat IV / F 43.2 - Immissionsschutz (Chemie)
Address
address
Haltestellen
- Haltestelle: Hauptbahnhof, Südseite
Linien:- S-Bahn: Linie diverse Linien
- Bus: Linie diverse Linien
- Regionalbahn: Linie diverse Linien
- Straßenbahn: Linie diverse Linien
Opening hours
Das Regierungspräsidium ist montags bis donnerstags von 8 bis 16:30 Uhr und freitags von 8 bis 15 Uhr telefonisch erreichbar.
Bitte erkundigen Sie sich vor Ihrem Besuch über die Öffnungszeiten und ob eine Terminvereinbarung notwendig ist.
Contact
Regierungspräsidium Darmstadt - Dezernat IV / F 43.1 - Immissionsschutz (Energie, Lärmschutz)
Address
address
Haltestellen
- Haltestelle: Hauptbahnhof, Südseite
Linien:- S-Bahn: Linie diverse Linien
- Bus: Linie diverse Linien
- Regionalbahn: Linie diverse Linien
- Straßenbahn: Linie diverse Linien
Opening hours
Das Regierungspräsidium ist montags bis donnerstags von 8 bis 16:30 Uhr und freitags von 8 bis 15 Uhr telefonisch erreichbar.
Bitte erkundigen Sie sich vor Ihrem Besuch über die Öffnungszeiten und ob eine Terminvereinbarung notwendig ist.
Contact
Required documents
- Required drawings, plans, expert opinions
- Explanations and
- other documents (if necessary, ask the competent authority).
Prerequisites
The partial permit is granted if the fulfilment of the obligations under the Federal Immission Control Act for the sub-project is ensured and if there are no other public law regulations or occupational health and safety concerns to the contrary and a preliminary assessment shows that there are no insurmountable obstacles to the construction and operation of the entire plant from the outset.
Basis for legal action
Legal remedy
- Contradiction
- Complaint
Procedure
The approval procedure requires a written application, which must be accompanied by the drawings, plans, expert opinions and explanations as well as other documents required to check the conditions for approval.
- If your application is complete, it must be made public with the documents, if necessary, and then displayed for one month. In simplified approval procedures or when public participation is waived, there is no public interpretation or discussion meeting.
- At the latest at the same time as the public announcement of the project, the licensing authority shall at the same time invite the authorities to be involved to submit their opinion on the permit requirements within one month.
- If the approval requirements are met, the authority examines whether there is a legitimate interest in the construction and operation of the sub-project.
- A preliminary assessment shows whether there are no insurmountable obstacles to the construction and operation of the entire installation with regard to the conditions for partial authorisation.
- You will receive the notification of approval or rejection of the sub-project.
Deadlines
Before the implementation of the project
Processing time
3 to 7 months (Without public participation, it takes three months. If the project has to be carried out with public participation, it will take seven months. The processing period begins for the competent authority when the application for the project is complete. An extension of three months for the procedure is possible.)
Costs
Es können weitere Kosten anfallen.: Fee from 2.500,00 EUR to 1.800.000,00 EUR
Notes (specifics)
The binding effect of the preliminary overall assessment does not apply if a change in the factual or legal situation or individual examinations in the context of subsequent partial approvals lead to an assessment that deviates from the preliminary overall assessment, i.e. the granting of further partial approvals or the overall approval may also be refused.
Further Information
Area of validity
Hesse
Official approval
Officially approved by Saxon State Ministry of Energy, Climate Protection, Environment and Agriculture (SMEKUL) on 02.01.2024
Keywords
Umwelteinwirkungen, Teilanlage, Betrieb eines Anlagenteils, Anlagenteile, Änderungsgenehmigung, Neugenehmigung, Immissionsschutz, Anlagen, immissionsschutzrechtlich, Genehmigungsverfahren, Zusätzliche Anlage, Teilgenehmigung, Gegenstand