Give advance notice of the establishment of a construction site

    If you are planning a major construction project, you must notify the relevant health and safety authority in advance of setting up your construction site.

    Description

    As the building owner, you or a third party commissioned by you must give advance notice to the competent occupational health and safety authority at least 2 weeks before setting up each construction site if

    • the expected duration of the work is more than 30 working days and more than 20 employees will be working on the construction site at the same time (i.e. over a period of at least one shift) or
    • the scope of your construction work is expected to exceed 500 person-days (where one person-day comprises the work of one person over one shift).

    Minimum details of the advance notice:

    • Location of the construction site,
    • Name and address of the client or building owner,
    • Type of construction project,
    • Name and address of the third party responsible instead of the client,
    • name and address of the coordinator,
    • expected start and expected duration of the work,
    • expected maximum number of employees on the construction site,
    • Number of employers and contractors without employees who are expected to work on the construction site,
    • details of the employers and contractors without employees already selected.

    The conditions are

    • Visible posting of the advance notice on the construction site
    • Adaptation of the notice in the event of significant changes without resubmission.

    Setting up the construction site begins with the essential preparatory work at the site of the construction project that is required immediately before it is carried out, for example

    • Installation of social facilities: for example toilets, break rooms or washrooms,
    • Installation of supply and disposal facilities,
    • delivery of building materials, machinery and equipment.

    You must also give advance notice

    • on the first day of the construction site at the latest,
    • post it visibly and legibly on the construction site, unaffected by external influences and the weather,
    • update it in the event of significant changes. It is not necessary to resubmit the notice to the competent health and safety authority.

    Significant changes that require an adjustment to the advance notice are, for example

    • Clients or commissioned third parties change,
    • Coordinator is newly appointed or changes,
    • the duration of the construction work is shortened, which means that more work has to be carried out simultaneously or in unplanned shifts
    • employees of several employers or subcontractors are working on the construction site at the same time for the first time,

    The number of employees working on the construction site at the same time or the number of employers or companies without employees increases significantly.

    Online service

    Vorankündigung der Einrichtung einer Baustelle übermitteln

    ID: L100001_376790503

    Description

    Wenn Sie als Bauherrin oder Bauherr oder deren/dessen Beauftragte oder Beauftragter die Ausführung eines größeren Bauvorhabens planen, müssen Sie spätestens zwei Wochen vor Einrichtung der Baustelle eine Vorankündigung an die zuständige Arbeitsschutz-Behörde übermitteln.

    Use this service online

    Trust level

    You need an account with password to use this online service (trust level: low).

    further information on the level of trust for online services

    Version

    Technisch erstellt on 14.12.2021

    Technisch geändert on 29.03.2023

    Language

    Deutsch

    Sprache: de

    Technisch erstellt on 07.06.2017

    Technisch geändert on 14.05.2025

    Competent office

    The responsible regional council

    Contact point

    The responsible regional council

    Contact person

    Regierungspräsidium Darmstadt - Abteilung VI Arbeitsschutz - Standort Wiesbaden

    Address

    address

    Kreuzberger Ring 17

    65205 Wiesbaden

    Save contact

    Haltestellen

    • Haltestelle: Wiesbaden-Erbenheim
      Regionalbahn: Linie Bahnanbindung über Wiesbaden-Erbenheim
    • Haltestelle: Tillpetersrech
      Bus: Linie 5
    • Haltestelle: Am Hochfeld
      Linien:
      • Bus: Linie 15
      • Bus: Linie 28
    • Haltestelle: Kreuzberger Ring
      Linien:
      • Bus: Linie 15
      • Bus: Linie 28

    Elevator available

    Wheelchair access

    Opening hours

    Das Regierungspräsidium ist montags bis donnerstags von 8 bis 16:30 Uhr und freitags von 8 bis 15 Uhr telefonisch erreichbar.

    Bitte erkundigen Sie sich vor Ihrem Besuch über die Öffnungszeiten und ob eine Terminvereinbarung notwendig ist.

    Contact

    telephone: +49 611 3309-2545

    fax: +49 611 3276-48655

    e-mail: arbeitsschutz@rpda.hessen.de

    Internet

    Version

    Technisch geändert on 20.01.2025

    Language version

    de

    Sprache: de

    Required documents

    • Advance notice: for example, using the sample form "Advance notice" in Appendix A of the rules for occupational health and safety on construction sites (RAB 10)
    • No legal remedy possible

    Deadlines

    Application deadline: 2 weeks (Transmission of the advance notice: no later than 2 weeks before the construction site is set up)

    Costs

    There are no costs.

    Notes (specifics)

    You are acting in breach of regulations if you intentionally or negligently fail to provide the responsible health and safety authority with the necessary advance notice, or do not do so correctly, completely or in good time.


    Check whether you are required to prepare a health and safety plan (SiGe plan) and a document for subsequent work in addition to the advance notice. Check whether information is required in addition to the advance notice. You can find information on this in the "Ordinance on Safety and Health Protection on Construction Sites"

    Further Information

    Area of validity

    Hesse

    Official approval

    Officially approved by Hessian Ministry of Labor, Integration, Youth and Social Affairs on 15.10.2024

    Version

    Technisch erstellt on 05.10.2022

    Technisch geändert on 18.02.2025

    Keywords

    Bauleiterin, Arbeitsschutz Handwerk, Arbeitsschutzbehörde, Übermittlung Vorankündigung, Baustelle einrichten, Beschäftigte auf Baustellen, Bauvorhaben, Baustellenvorankündigung, Bauvorankündigung, Baustellenverordnung, Zuständige Behörde Vorankündigung, Vorankündigung, Arbeitsschutz, Baustelle, Einrichtung Baustelle, Bauvorhaben starten, Vorankündigung Einrichtung Baustelle, Bauleiter, Bauherrin, Arbeitsschutz Baustelle, Bauherr

    Language version

    Deutsch

    Sprache: de

    Technisch erstellt on 07.06.2017

    Technisch geändert on 14.05.2025

    Englisch

    Sprache: en

    Sprachbezeichnung nativ:

    English

    Technisch erstellt on 07.07.2021

    Technisch geändert on 26.11.2019