Incineration and co-incineration of waste Measurement continuous

    The results of the continuous measurements must be submitted annually to the competent authorities for examination.

    Description

    As an operator of a plant for the incineration or co-incineration of waste, you are obliged to continuously determine emissions and certain operating parameters through continuous measurements in order to monitor emissions of air pollutants and to assess proper operation. A measurement report on the results of the continuous measurements shall be drawn up for each calendar year and submitted to the competent authority for review by 31 March of the following year.

    Online service

    Verbrennung pflanzlicher Abfälle

    ID: L100001_382017083

    Description

    Anmeldung einer Verbrennung landwirtschaftlicher und gärtnerischer Abfälle.

    Use this service online

    Trust level

    You need an account with password to use this online service (trust level: low).

    further information on the level of trust for online services

    Version

    Technisch erstellt on 13.10.2022

    Technisch geändert on 13.10.2022

    Language

    Deutsch

    Sprache: de

    Technisch erstellt on 07.06.2017

    Technisch geändert on 14.05.2025

    Competent office

    The competent authorities are the regional councils.

    Contact person

    Unfortunately, no contact persons were found for Elbtal (District Limburg-Weilburg, Hesse). Please check the service description above for information on how to find the responsible contact person.

    Required documents

    • measurement report on continuous measurements;
    • additional submission of reports on functional tests and calibrations

    Forms

    With regard to the contents of the measurement report on continuous measurements, reference is made to the circular of the BMU "Federal Uniform Practice in the Monitoring of Emissions" and the requirements for evaluation systems contained therein.

    The content of the reports on functional tests and calibrations of measuring equipment for continuous measurements should comply with the requirements of guideline VDI 3950 Part 2.

    This administrative service does not constitute an administrative act. For this reason, no remedy will result.

    Procedure

    The official requirements for carrying out the continuous measurements as well as for the submission of the measurement report result from the approval notice and the regulations of the 17th BImSchV.

    In the future, the measurement report will be submitted via the online portal "EMBE-Online".

    Deadlines

    The continuous measurement report shall be submitted to the competent authority for review by 31 March of the following year. The reports on the results of the calibration and the functional test shall be submitted within twelve weeks of calibration and testing.

    Costs

    The fee is calculated according to the time required for the competent authority to review emission measurement reports of the bodies notified in accordance with § 29b BImSchG.

    Area of validity

    Hesse

    Official approval

    Officially approved by Hessian Ministry for the Environment, Climate Protection, Agriculture and Consumer Protection on 15.03.2022

    Version

    Technisch erstellt on 09.03.2021

    Technisch geändert on 25.02.2025

    Keywords

    Emissionsmessbericht, Emissionen, Emissionsmessung, 17. BImSchV, Mitverbrennung, Abfälle, Verbrennung, Luftschadstoffe

    Language version

    Deutsch

    Sprache: de

    Technisch erstellt on 07.06.2017

    Technisch geändert on 14.05.2025

    Englisch

    Sprache: en

    Sprachbezeichnung nativ:

    English

    Technisch erstellt on 07.07.2021

    Technisch geändert on 26.11.2019