Immission control - apply for or report industrial plants

    The construction and operation of plants require an immission control permit if they are likely to cause particular damage to the environment or endanger the general public.

    Description

    If you want to build and operate a plant which, due to its nature or operation, is particularly suitable to cause harmful environmental effects or in any other way to endanger, significantly disadvantage or significantly annoy the general public or the neighbourhood, you need a permit from the competent authority. This includes stationary waste disposal facilities for the storage or treatment of waste.

    Contact point

    In Hesse, the regional councils issue the necessary immission control permits.

    Contact person

    Regierungspräsidium Darmstadt - Dezernat IV / F 43.4 - Immissionsschutz (Metall)

    Address

    address

    Gutleutstraße 114

    60327 Frankfurt am Main

    Save contact

    Opening hours

    Das Regierungspräsidium ist montags bis donnerstags von 8 bis 16:30 Uhr und freitags von 8 bis 15 Uhr telefonisch erreichbar.

    Bitte erkundigen Sie sich vor Ihrem Besuch über die Öffnungszeiten und ob eine Terminvereinbarung notwendig ist.

    Contact

    telephone: +49 69 2714-5993

    fax: +49 69 2714-5906

    e-mail: Poststelle_IV_F@rpda.hessen.de

    Version

    Technisch geändert on 20.01.2025

    Language version

    de

    Sprache: de

    Regierungspräsidium Darmstadt - Dezernat IV / F 43.2 - Immissionsschutz (Chemie)

    Address

    address

    Gutleutstraße 114

    60327 Frankfurt am Main

    Save contact

    Haltestellen

    • Haltestelle: Hauptbahnhof, Südseite
      Linien:
      • S-Bahn: Linie diverse Linien
      • Bus: Linie diverse Linien
      • Regionalbahn: Linie diverse Linien
      • Straßenbahn: Linie diverse Linien

    Opening hours

    Das Regierungspräsidium ist montags bis donnerstags von 8 bis 16:30 Uhr und freitags von 8 bis 15 Uhr telefonisch erreichbar.

    Bitte erkundigen Sie sich vor Ihrem Besuch über die Öffnungszeiten und ob eine Terminvereinbarung notwendig ist.

    Contact

    Version

    Technisch geändert on 02.05.2025

    Language version

    de

    Sprache: de

    Regierungspräsidium Darmstadt - Dezernat IV / F 43.1 - Immissionsschutz (Energie, Lärmschutz)

    Address

    address

    Gutleutstraße 114

    60327 Frankfurt am Main

    Save contact

    Haltestellen

    • Haltestelle: Hauptbahnhof, Südseite
      Linien:
      • S-Bahn: Linie diverse Linien
      • Bus: Linie diverse Linien
      • Regionalbahn: Linie diverse Linien
      • Straßenbahn: Linie diverse Linien

    Opening hours

    Das Regierungspräsidium ist montags bis donnerstags von 8 bis 16:30 Uhr und freitags von 8 bis 15 Uhr telefonisch erreichbar.

    Bitte erkundigen Sie sich vor Ihrem Besuch über die Öffnungszeiten und ob eine Terminvereinbarung notwendig ist.

    Contact

    telephone: +49 69 2714-5990

    fax: +49 69 2714-5906

    e-mail: Poststelle_IV_F@rpda.hessen.de

    Version

    Technisch geändert on 02.05.2025

    Language version

    de

    Sprache: de

    Required documents

    Forms

    • Written form required: yes
    • Personal appearance required: if necessary. yes

    Information for Hesse: Immissionsschutz - Industrieanlagen beantragen oder anzeigen

    • elektronische Antragsstellung möglich: ja

    Prerequisites

    Klage vor dem Verwaltungsgericht bzw. Verwaltungsgerichtshof

    Procedure

    The approval procedure shall be subject to a written application, accompanied by the drawings, explanatory notes and other documents necessary to verify the conditions for authorisation. If the application is complete, it may be necessary. to make the documents public with the documents and then to make them available for one month. In simplified authorisation procedures or if public participation is not used, there is no public interpretation and no hearing takes place. At the latest at the same time as the public announcement of the project, the approval authority shall simultaneously request the authorities to be involved to give their opinion on the permit conditions within one month. If there are objections, they will be discussed with you and those who raised the objections in a public meeting. Once the approval authority has identified all the circumstances relevant for the granting of an authorisation, a decision shall be taken on the application. The approval notice must be justified in writing and will be sent to you and the persons who have raised objections. The notification of the approval decision to objectors may be replaced by public notice.

    Deadlines

    The operator must have the plant approved by the competent authority before it is built and operated.

    Processing time

    7 months (Die Bearbeitung beginnt mit der Vollständigkeit der Antragsunterlagen.)

    Costs

    Es können weitere Kosten anfallen.: Fee from 2.500,00 EUR to 1.800.000,00 EUR

    Further Information

    Area of validity

    Hesse

    Official approval

    Officially approved by Hessisches Ministerium für Landwirtschaft und Umwelt, Weinbau, Forsten, Jagd und Heimat 15.03.2022 Hessisches Ministerium für Umwelt, Klimaschutz, Landwirtschaft und Verbraucherschutz on 02.01.2024

    Information for Hesse: Immissionsschutz - Industrieanlagen beantragen oder anzeigen

    Officially approved by 15.03.2022; Hessisches Ministerium für Umwelt, Klimaschutz, Landwirtschaft und Verbraucherschutz on 15.03.2022

    Version

    Technisch erstellt on 20.05.2014

    Technisch geändert on 14.05.2025

    Keywords

    Errichtung, Umwelteinwirkungen, Immissionsschutz, genehmigungsbedürftig, Anlage, Betrieb, Immissionsschutzrechtliche, Genehmigung

    Language version

    Deutsch

    Sprache: de

    Technisch erstellt on 07.06.2017

    Technisch geändert on 14.05.2025

    Englisch

    Sprache: en

    Sprachbezeichnung nativ:

    English

    Technisch erstellt on 07.07.2021

    Technisch geändert on 26.11.2019