Inquiry of the operators of directional radio links in the specified plan area

    If you have any inquiries or comments about directional radio interference, you can contact the Federal Network Agency by e-mail. As the public body responsible for urban land use planning, the Federal Network Agency will examine your concerns and provide you with a statement.

    Description

    The Federal Network Agency allocates frequencies for the operation of radio relay systems. It can make a contribution to the avoidance of directional radio interference in planning and approval procedures, within the framework of building law or immission control law. Such directional radio interference can be caused by new, tall structures, for example wind turbines or high-rise buildings.

    In order to avoid corresponding directional radio interference, the Federal Network Agency will, upon request, provide the names and addresses of the directional radio operators in question for the construction area for the current time.

    This means that planning authorities can inform any affected radio relay operators at an early stage about the planned construction work or land use. The Federal Network Agency also checks whether radio stations of the radiolocation system (radar) or the radio measuring stations of the Federal Network Agency operated in the public interest are affected.

    The selection or construction of the transmitting and receiving sites of microwave links and the associated determination of the routing are the responsibility of the microwave operators. The protection of radio relay routes and the safeguarding of interests vis-à-vis cities and municipalities is the exclusive responsibility of the radio relay operators.

    Information on specific routes and technical parameters contains company or trade secrets. This information can only be obtained directly from the radio relay operators. Safety distances to microwave links must be coordinated with the microwave operators concerned.

    Contact person

    Bundesnetzagentur für Elektrizität, Gas, Telekommunikation, Post und Eisenbahnen (BNetzA), Referat 226

    Address

    address

    Fehrbelliner Platz 3

    10707 Berlin

    Save contact

    Opening hours

    Servicezeiten Montag: 09:00 - 16:00 Uhr Dienstag: 09:00 - 16:00 Uhr Mittwoch: 09:00 - 16:00 Uhr Donnerstag: 09:00 - 16:00 Uhr Freitag: 09:00 - 15:00 Uhr

    Contact

    Version

    Technisch geändert on 09.07.2025

    Language version

    Deutsch

    Sprache: de

    Required documents

    The request must be accompanied by the following documents:

    • a topographic map with the construction area and landmarks marked (no cadastral maps)

    Forms

    • Forms available: Yes
    • Written form required: No
    • Informal application possible: Yes
    • Personal appearance required: No
    • Online service available: No

    Prerequisites

    There are no prerequisites.

    No legal remedy is given.

    Procedure

    You can send your inquiry about urban land use planning to the Federal Network Agency by e-mail:

    • Go to the website of the Federal Network Agency.
    • Download the "Form to query operators of directional radio links in the specified planning area".
    • Send the completed form to the following e-mail address: 226.Postfach@BNetzA.de.
    • The Federal Network Agency will check your inquiry and send you a statement by e-mail.

    Deadlines

    You do not have to observe any deadlines.

    Processing time

    4 weeks

    Costs

    There are no costs involved.

    Further Information

    Area of validity

    Germany-wide

    Official approval

    Officially approved by Federal Ministry of Digital Affairs and Transport (BMDV) on 09.01.2023

    Version

    Technisch geändert on 01.12.2025

    Keywords

    ToB, Public authorities, Operator

    Language version

    Deutsch

    Sprache: de

    Englisch

    Sprache: en

    Sprachbezeichnung nativ:

    English