Registering electricity and gas units in the register

    If you operate an electricity or gas installation and it is connected to an electricity or gas grid, you must register the unit in the Market Master Data Register (MaStR) of the Federal Network Agency. You only have to register plants in planning in certain cases.

    Description

    As the central register for the energy transition, the Market Master Data Register (MaStR) records data on all generation plants:

    • All new plants and all existing plants,
    • installations for the generation of renewable and conventional energy,
    • electricity and gas generation plants.

    If you operate an electricity or gas generation plant (for example, photovoltaic plant, wind energy plant, combined heat and power plant, battery storage, biomethane plant), you must register it in the MaStR. You are also obliged to register if no subsidy is granted or claimed for the electricity from the plant.
    All running plants must be registered regardless of when they were commissioned - even if your plant has been running for many years. This means that even if you have already registered your plant in various other places, for example with your grid operator or in earlier registers of the Federal Network Agency, you must register these plants again in the MaStR.
    If an installation is shut down, you must also report this in the register. If the installation is not connected to any electricity or gas grid, no notification is required.
    To ensure that payments under the Renewable Energy Sources Act (EEG) or the Combined Heat and Power Act (KWKG) are paid out without deductions, you must comply with the registration deadlines set by the legislator.
    You must register via the Federal Network Agency's Internet portal.
    As a citizen, you can also register via forms in exceptional cases.
    Authorities can access the MaStR data. This enables them to either significantly simplify their own surveys or dispense with them altogether. Plant operators and other market players can refer to the data they have entered in the MaStR.





    Online service

    Internetportal des Marktstammdatenregisters

    ID: B100019_103448712

    Use this service online

    Trust level

    The level of trust for this online service is not defined (Trust Level undefined).

    further information on the level of trust for online services

    Language

    Deutsch

    Sprache: de

    Contact person

    Bundesnetzagentur für Elektrizität, Gas, Telekommunikation, Post und Eisenbahnen (BNetzA)

    Address

    address

    Tulpenfeld 4

    53113 Bonn

    Save contact

    PO box address

    Post office box 8001

    53105 Bonn

    Contact

    Internet

    Version

    Technisch geändert on 09.01.2023

    Language version

    Deutsch

    Sprache: de

    Bundesnetzagentur für Elektrizität, Gas, Telekommunikation, Post und Eisenbahnen (BNetzA) - Marktstammdatenregister

    Address

    address

    Tulpenfeld 4

    53113 Bonn

    Save contact

    Opening hours

    Telefon-Servicezeiten: * Montag 8:00 bis 16:30 Uhr * Dienstag 8:00 bis 16:30 Uhr * Mittwoch 8:00 bis 13:00 Uhr * Donnerstag 8:00 bis 18:00 Uhr * Freitag 8:00 bis 12:00 Uhr

    Contact

    Internet

    Version

    Technisch geändert on 09.09.2025

    Language version

    Deutsch

    Sprache: de

    Required documents

    The information required for registration can be found in the following documents:

    • Commissioning record of the electricity or gas generation plant.
    • Year-end accounts
    • previous registration certificates from the Federal Network Agency

    Forms

    Forms: in exceptional cases only for natural persons on request (by telephone or in writing)

    Online procedure: yes

    Written form required: no

    Personal appearance required: no

    Prerequisites

    You do not have to meet any prerequisites.

    There is no provision for appeal.

    Procedure

    If you would like to register yourself as an operator and your electricity and gas generation plants in the MaStR, you can do so via the MaStR Internet portal:

    • Access the MaStR Internet portal and first register as a user with a valid e-mail address.
    • Log on to the MaStR Internet portal and register as an installation operator.
    • Then register your installations.
    • If your registration is successful, the system will provide you with your registration certificate with your registration numbers (MaStR numbers).
    • You can make changes and corrections online at any time.

    Deadlines

    You must register within 1 month of the occurrence of an event requiring registration.

    Processing time

    • Online procedure: none, registration confirmation can be printed out directly
    • Form registration: approx. 14 days (from application to receipt of registration confirmation)

    Costs

    You don't have to pay anything.

    Further Information

    Area of validity

    Germany-wide

    Official approval

    Officially approved by Federal Ministry for Economic Affairs and Energy on 10.08.2021

    Version

    Technisch geändert on 09.09.2025

    Keywords

    Verbrauchsanlage, Erzeugungsanlage, Gas, Energieversorgung, Gasnetz, Windenergie, Stromnetz, MaStR-Nummer, Energiewende, KWKG, Erneuerbare Energien, Strom, Photovoltaik, Stammdaten, EEG

    Language version

    Deutsch

    Sprache: de

    Englisch

    Sprache: en

    Sprachbezeichnung nativ:

    English