Register market players in the register

    If you are a market player in the electricity or gas market, you must register in the Market Master Data Register (MaStR) of the Federal Network Agency.

    Description

    As the central register for the energy transition, the Market Master Data Register (MaStR) records data on all relevant market players in the electricity and gas energy market and, in a second step, all generation facilities:

    • All new plants and all existing plants,
    • Plants for the generation of renewable and conventional energy,
    • plants for the generation of electricity and gas.

    If you operate an electricity or gas generation system (e.g. photovoltaic system, wind energy system, combined heat and power plant, battery storage system, biomethane system), you must register it in the MaStR. You are also obliged to register if no subsidy is granted or claimed for the electricity from the system.

    All running systems must be registered regardless of when they were commissioned - even if your system has been running for many years. This means that even if you have already registered your system at various other locations, for example with your grid operator or in previous registers of the Federal Network Agency, you must register these systems once again in the MaStR.

    As a citizen (natural person), you can also register using forms in exceptional cases on request.

    Authorities can access the data in the MaStR. This allows them to either significantly simplify their own surveys or dispense with them altogether. Installation operators and other market players can refer to the data they have entered in the MaStR.

    Online service

    Internet portal of the market master data register

    ID: B100019_124123559

    Description

    In the Market Master Data Register (MaStR) you can mainly register master data for the electricity and gas market.

    Use this service online

    Trust level

    You need an account with password to use this online service (trust level: low).

    further information on the level of trust for online services

    Identification

    • electronic identification using national eID means – user name/password

    Language

    Deutsch

    Sprache: de

    Englisch

    Sprache: en

    Sprachbezeichnung nativ:

    English

    Contact person

    Bundesnetzagentur für Elektrizität, Gas, Telekommunikation, Post und Eisenbahnen (BNetzA)

    Address

    address

    Tulpenfeld 4

    53113 Bonn

    Save contact

    PO box address

    Post office box 8001

    53105 Bonn

    Contact

    Internet

    Version

    Technisch geändert on 26.01.2026

    Language version

    Deutsch

    Sprache: de

    Englisch

    Sprache: en

    Sprachbezeichnung nativ:

    English

    Bundesnetzagentur für Elektrizität, Gas, Telekommunikation, Post und Eisenbahnen (BNetzA) - Marktstammdatenregister

    Address

    address

    Tulpenfeld 4

    53113 Bonn

    Save contact

    Opening hours

    Telefon-Servicezeiten: * Montag 8:00 bis 16:30 Uhr * Dienstag 8:00 bis 16:30 Uhr * Mittwoch 8:00 bis 13:00 Uhr * Donnerstag 8:00 bis 18:00 Uhr * Freitag 8:00 bis 12:00 Uhr

    Contact

    Internet

    Version

    Technisch geändert on 09.09.2025

    Language version

    Deutsch

    Sprache: de

    Required documents

    No special documents are required for registration as a market player. For the registration of the units in the second step, the documents are listed separately.

    Procedure

    If you would like to register yourself as an operator and your electricity and gas generation facilities in the Market Master Data Register (MaStR), you can do so via the MaStR internet portal:

    • Access the MaStR internet portal and first register as a user with a valid e-mail address.
    • Log in to the MaStR internet portal and register as a system operator.
    • Then register your unit in the second step.
    • Once you have successfully registered, the system will provide you with your registration certificate with your registration numbers (MaStR numbers).
    • You can make changes and corrections online at any time.

    Deadlines

    A deadline of 1 month applies for the notification of market players.

    Processing time

    • Online procedure: none, registration confirmation can be printed out directly
    • Form registration: approx. 14 days (from application to receipt of registration confirmation)

    1 to 14 days

    Costs

    Fee free of charge

    Further Information

    Area of validity

    Germany-wide

    Official approval

    Officially approved by Federal Ministry for Economic Affairs and Energy (BMWE) on 05.09.2025

    Version

    Technisch geändert on 21.10.2025

    Keywords

    Photovoltaik, Strom, Erzeugungsanlage, Energiewende, Stromnetz, EEG, MaStR-Nummer, Erneuerbare Energien, Windenergie, Gasnetz, Gas, Energieversorgung, KWKG, Verbrauchsanlagen, Stammdaten, Marktakteure

    Language version

    Englisch

    Sprache: en

    Sprachbezeichnung nativ:

    English

    Deutsch

    Sprache: de