    You need a structural change to the road for your property access in town. This must be applied for at the competent road construction authority.   

    Description

    You are the owner of a plot of land within the locality. You would like to have a driveway built to your property in order to access a garage or parking space from the street with a motor vehicle. This often requires a structural change to the road, such as lowering the curb. This must be applied for at the competent road construction authority.  

    As a rule, curb lowering or other adjustments to the road are carried out by the competent road construction authority itself or by a company commissioned by it. In exceptional cases, these can also be carried out by a company commissioned by the resident himself with the consent of the competent authority. Your city or municipality will provide you with information on this.

    All costs for the changes to the road must be borne by you. This also applies to administrative costs, which may be determined by the competent road construction authority.
     

    Online services

    Alternatively, please enter a location or postcode in the City / Location input field to see the responsible online service in this section

    Competent office

    Road Construction Authority

    Contact person

    Please enter a location or postcode in the City / Location input field to see the responsible contact person

    Prerequisites

    The applicant must also be the owner of the adjacent property. Suitable proof (extract from the land register or notary contract) may be required for this.

    Alternatively, you have a power of attorney from the property owner.
     

    • Contradiction
    • Appeal before the Administrative Court
       

    Procedure

    You apply for the structural modification of the road with all the necessary documents to the responsible road construction authority. Once the application has been submitted, it will be checked whether the application is complete. If required documents are still missing, you will receive a notification from the competent authority. An on-site appointment may also be necessary. It will then be examined whether there are reasons not to change the road. After reviewing your application, you will receive a decision.

    Area of validity

    Hesse

    Official approval

    Officially approved by Hessian Ministry of Economic Affairs, Energy, Transport and Housing on 26.10.2023

    Version

    Technisch erstellt on 07.11.2023
    Technisch geändert on 08.07.2024

    Keywords

    Sidewalk crossing, Property access, Kerb lowering

    Language version

    Deutsch

    Sprache: de
    Technisch erstellt on 07.06.2017
    Technisch geändert on 14.05.2025

    Englisch

    Sprache: en
    Sprachbezeichnung nativ: English
    Technisch erstellt on 22.10.2025
    Technisch geändert on 26.11.2019