Construction and operation of a plant requiring monitoring in accordance with the Ordinance on Industrial Safety and Health Permit
If you wish to set up or operate an installation that requires monitoring or make certain changes to it, you must apply for a permit from the competent authority.
Description
You require a permit from the competent authority if you:
- wish to set up and operate an installation requiring monitoring or
- wish to make changes to the design or mode of operation that affect the safety of the system.
Permission may be granted subject to the following restrictions:
- limited,
- limited in time,
- subject to conditions or
- with conditions.
If the installation requiring a permit is part of an installation requiring a permit no separate permit is issued. The approval includes the permit.
Competent office
The occupational health and safety departments of the Darmstadt, Giessen and Kassel regional councils are responsible.
Contact person
Please enter a location or postcode in the City / Location input field to see the responsible contact person
Forms
Forms available: No
Written form required: Yes
Informal application possible: Yes
Personal appearance necessary: No
Online services available: No
Prerequisites
- The installation for which you are applying for a permit must be an installation requiring a permit.
- You must construct and operate the installation requiring monitoring in accordance with the state of the art.
- Your documentation must be complete, plausible and meaningful.
- The test report from the approved inspection body (ZÜS) must confirm that the system applied for can be operated safely if the measures specified in the documents, including the tests, are complied with.
Basis for legal action
Legal remedy
Appeal:
- You can appeal against the decision within one month of notification.
- You must submit the appeal to the competent authority in writing or for the record.
Procedure
- Submit the application for approval of the system requiring monitoring with the required documents including the test report from the approved monitoring body (ZÜS) to the responsible authority.
- If a permit is required in accordance with the Federal Immission Control Act, you will receive the application documents back, as a permit in accordance with the Industrial Safety Ordinance will then also be checked as part of the necessary permit in accordance with the Federal Immission Control Act.
- The competent authority will make its decision after examination and inform you.
Processing time
0 to 3 months (The processing time applies from receipt of the complete application documents. An extension of the processing period is possible in justified cases.)
Further Information
The publication (LV 49) contains a list of the required application documents for installations requiring monitoring in Annex 1 - 6.
Area of validity
Hesse
Official approval
Officially approved by Hessian Ministry for Social Affairs and Integration (HMSI) on 11.07.2023
Keywords
Security, Construction, Liquids, Authorization, Authorization, Occupational safety