Ground fault - View work with direct or indirect effects on groundwater

    Do you want to drill holes or other earthworks that can influence the movements or the quality of the groundwater? Then you must notify the competent authority beforehand.

    Description

    If you want to carry out so-called earth outcrops, you must report this to the competent authority. Outcrops are boreholes or other earthworks that extend so deep into the ground that they can affect the movements or nature of groundwater.

    The notification is required for the following projects:

    • Old mining exploration or cavity exploration
    • Investigation of contaminated sites (except groundwater measuring points)
    • Well
    • Geochemical investigation
    • Geophysical survey
    • Geothermal outcrops (other)
    • Groundwater measuring point (except wells)
    • Engineering geological investigation or ground investigation
    • Mapping (except base drilling)
    • Raw Material Exploration Drilling
    • Other information purposes
    • Geothermal use with groundwater heat pumps

    Each well provides data for the assessment of the subsurface at the respective location. The display enables the competent authorities to get an impression of the drilling project and the material produced on site. The authorities can carry out supplementary measurements and ensure the quality of the drilling results. This prevents costly wrong decisions in underground spatial planning.

    Online services

    There is currently no online service available for this location.

    Competent office

    Competent authorities result from the location of the planned drilling points, usually the lower water authorities

    Contact person

    Unfortunately, no contact persons were found for District Groß-Gerau (Hesse). Please check the service description above for information on how to find the responsible contact person.

    Contradiction

    Procedure

    If your request is a complaint, you may start your project if you have not heard from the authority within one month.
    If your project requires a water permit, exemption or permit, you will receive feedback within one month.

    Deadlines

    The display must be made before you start the work.

    Area of validity

    Hesse

    Official approval

    Officially approved by Hessian Ministry for the Environment, Climate Protection, Agriculture and Consumer Protection on 29.03.2023

    Version

    Technisch erstellt on 08.02.2023

    Technisch geändert on 08.07.2024

    Keywords

    Brunnen, Altlastenerkundung, Rohstoffe, Grundwassermessstelle, Erdaufschluss, Ingenieurgeologische Untersuchung, Bodeneingriff, Bohrung, Pfahlgründung, Kellerbau, Erdarbeiten, Geophysikalische Untersuchung, Kartierung, Bohranzeige, Altbergbauerkundung, Baugrundsondierung, Grundwasser, Baugrunduntersuchung, Bauvorhaben, Hohlraumerkundung

    Language version

    Deutsch

    Sprache: de

    Technisch erstellt on 07.06.2017

    Technisch geändert on 14.05.2025

    Englisch

    Sprache: en

    Sprachbezeichnung nativ:

    English

    Technisch erstellt on 07.07.2021

    Technisch geändert on 26.11.2019